Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

REDEFINING LOGISTICS LANDSCAPE

byMaritimegateway
December 1, 2017
in Interviews
Reading Time: 3 mins read

Logistics has become a focal point for many solar energy enterprises that are looking for cost savings, greater efficiencies and new markets. Vinay Shetty, MD, Canadian Solar India outlines how logistics infrastructure can be strengthened to meet the needs of the industry.

Q How would you assess the logistics preparedness of our ports and freight forwarders in India?

 I would categorise handling of solar panels in two locations – at the port and at the site. At both places we would like to reduce multiple handling. At the ports, containers with solar modules can be RFID tagged and kept for clearance at a designated location to avoid multiple handling. An exclusive warehousing space for de-stuffing can minimise cracking of panels.

At the site, the presence of adequate equipment is the biggest drawback. Even the biggest ICDs in India do not have sufficient equipment. While handlers all over the world employ two people to carry the modules with equipment, in India one person carries it from the truck to the installation point bearing it on his head. As a result, the glass casing over the module is susceptible to developing cracks. Usage of forklifts at the site can prevent such mishaps.

 Q Why solar panel importers prefer moving cargo by road over rail?

Using rail transport is tedious and stressful. The route and schedule are always uncertain and the shipper is never sure of when his cargo will be aboard once it arrives in to the port. From 8 hours to 3 days it could be any time within a week. This makes planning difficult for us and we lose out on production time. We have equal complaints on road transport as well. But typically, most solar projects are in remote areas, we have no choice but to use road transport. The roads to the project site aren’t laid well. We have our set of woes with the truckers too who abandon cargo at the site once they offload it. On an average, it takes us 28 days to receive cargo at site for installation from the time of arrival at the port.

 Q The Customs are thinking of a re-classification too.

 Yes, the Customs has classified solar panels as a DC Generator which attracts additional duty of 7.5 per cent. For the last 40 years, they were classified as modules but now they have decided to re-classify this because they believe modules can generate power, the truth being that modules need an inverter or a charge controller to generate electricity. This duty on 8-9GW on modules is a huge sum for anyone to bear.

Q What best practices can we adopt from ports overseas where panels are frequently handled?

Rotterdam, I’m given to believe, has some of the best facilities for handling such equipment. They’re not just efficient but are transparent too. In much of Europe too, when a shipment lands, you can affix a cost to every step of the logistics process. In India, you can’t affix a cost to any process because there is no standard operating procedure. Each time the importer is presented with a different costing module to the same destination. For instance, a different destination charge is levied by different shipping lines when the route and the origin and final destination are same. Clearance charges for the same quantum of shipment vary each time making it cost ineffective for the shipper.

 Q India is set to be the third largest PV market. What is the estimate of containers doing the rounds?

Let’s do a simple math. Given that solar panels are huge, we usually use 40 footers. A Gigawatt of power roughly means 10,000 teu. With India’s estimates of solar power production scaling limits every year, I see tremendous requirement for not just containers, but a uniform handling policy across ports and rail-road transport.

[/vc_column_text]

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

BALACHANDRAN KRISHNAMURTHI
Articles

Inside PSA Chennai’s Next Phase of Growth

October 9, 2026
More Boxes, Smarter Decks: MacGregor’s Plan for Container Shipping
Articles

More Boxes, Smarter Decks: MacGregor’s Plan for Container Shipping

October 9, 2026
The Steel Cutting That Matters
Interviews

The Steel Cutting That Matters

September 9, 2026
“We Need a Bharat Container Line”: Apar Industries on Freight Volatility, Port Bottlenecks, and India’s Coastal Shipping Gap
Articles

“We Need a Bharat Container Line”: Apar Industries on Freight Volatility, Port Bottlenecks, and India’s Coastal Shipping Gap

August 26, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post
“We believe in India’s growth story and like to be part of it.”

“We believe in India’s growth story and like to be part of it.”

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.