Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

Ships with nine and half meter draft can call Chittagong Port

byMaritimegateway
August 8, 2021
in News
Reading Time: 3 mins read

During the high tide in Bangladesh for so many days, ships with a maximum depth of 9 and a half meters had the facility to land directly at the port jetty. That facility has now been upgraded to 10 meters. Ships with a depth of 10 meters can now be loaded at any time at the jetty of Matarbari Power Station in Maheshkhali Upazila of Cox’s Bazar. The Chittagong Port Authority announced the facility this month.

The deeper the ship can be anchored at the jetty, the more goods can be transported. As the cost of transporting goods decreases, so does the capacity of the port. This is a big component of port facilities.

At the main jetty of Chittagong port, ships with a maximum draft of 9 and a half meters (underwater part of the ship) or depth can now be loaded. At Mongla port it is seven to seven and a half meters. And in Matarbari, the project under Chittagong port, it is 10 meters, which will be gradually increased to 14 meters.

Construction of the 300-meter coal jetty at Matarbari is expected to be completed in December this year. It will be able to accommodate large coal-carrying ships at the jetty of the power plant from next year. The jetty of Matarbari Power Station will be named as the highest port facility in Bangladesh before the new terminal of Chittagong port is opened.

When asked, Chittagong Port Chairman Rear Admiral M Shahjahan told Prothom Alo on Sunday that considering the draft or depth of the ship, the biggest advantage now is in Matarbari. The port is providing all the ancillary facilities for ships.

Even if the port facility is increased in Matarbari, the importers and exporters of the country will not get its benefits now. This is because only power plant construction equipment is being brought to the two jetties for unloading coal and oil at Matarbari. Coal will be imported in big ships in front.

The construction work of Matarbari deep seaport terminal under Chittagong port will be completed in 2025. Then import-export trade will get benefit. And if the road connection is introduced, this terminal will get full benefits from 2026.

Chittagong Chamber President Mahbubul Alam told Prothom Alo that even though he did not get the benefit now, it is definitely good news. There is no doubt that this terminal will be the regional hub of import-export trade in the future. But that’s right, the Bay Terminal project needs to be implemented faster now. Then we don’t have to think about port facilities for the next 50 years.

The construction of a 14 km long waterway at Matarbari Jetty is in the final stages of construction with an average depth of 18 meters (Min C label). This average depth means that the waterway will have about 16 meters of water at low tide. It can be used to navigate ships to a depth of 14 meters.

The work of laying the fuel oil supply pipeline of Bangladesh Petroleum Corporation’s ‘Single Point Mooring’ project on Matarbari waterway has been going on for so long. For that, part of the waterway was temporarily diverted. There was no opportunity to ship more than 9 meters deep in the jetty. Now the work of laying the pipeline in that part has been completed. As a result, there is no obstacle to bring and take ships 10 meters deep in the waterway.

However, there was no opportunity to load very large ships at length. Only 150 meters long ships can be loaded. According to the port officials, barges,

Source : Stock News World

Tags: chittagong Port|Mongla Port|port news

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

India ship entry rules add salvage and pollution-response checks
Customs

India ship entry rules add salvage and pollution-response checks

October 10, 2026
NCT concession keeps ownership with Bangladesh
Asia

NCT concession keeps ownership with Bangladesh, says shipping minister

October 10, 2026
Major Ports Cargo Traffic Climbs 8% in First Half of FY27
Cargo

Major Ports Cargo Traffic Climbs 8% in First Half of FY27 as Growth Gathers Pace

October 10, 2026
Trichy Dry Port Moves Ahead
Cargo

Trichy Dry Port Moves Ahead as Tamil Nadu Shortlists Sites for Multimodal Logistics Hub

October 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post

IOCL aims to supply more LNG

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.