Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

Consultant to be appointed for Bay Terminal works

byKalpana Pandey
September 2, 2022
in Asia, Bulk Ports, Container Terminals, News, Ports
Reading Time: 3 mins read

The government will appoint a German joint venture as the consultant for the construction of a breakwater and channel dredging work at the proposed Bay Terminal, a long-awaited project of Chattogram port.

The cabinet committee on public purchase yesterday approved the Chattogram Port Authority’s (CPA’s) proposal to appoint a joint venture of Sellhorn, WSP, KS and Aqua, Germany, as the consultant for the channel dredging and breakwater construction works of the Bay Terminal Construction Project at Tk 51.30 crore.

Once the terminal is operational, it will enable Chattogram port to operate round-the-clock vessel movement as the site is on the coast of the Bay of Bengal. Currently, vessel movement to and from the port through the Karnaphuli channel depends on high tides.

Moreover, vessels with a draft of up to 12 metres can be berthed at the proposed terminal while the port can currently allow only vessels with a draft as high as 9.5 metres to moor.

The terminal is being constructed on around 2,500 acres of land. It will have a length of 6.15 kilometres, stretching from the backside of the Chattogram Export Processing Zone (CEPZ) to Rasmonighat on the Halishahar coast of the Bay of Bengal.

Talks on the Bay Terminal project began in 2011 as the prospect of building a mega container terminal emerged after an 11km long natural island surfaced from the seabed near the Halishahar coast, creating a natural channel for vessel movement.

CPA Chairman Rear Admiral Mohammad Shahjahan told The Daily Star yesterday that there are two parts of construction to build the terminal: one is jetty-related and the other is breakwater construction and channel dredging.

The natural island would be raised to form a breakwater to protect the port channel from strong waves while dredging is required for enhancing its depth.

“The German consultancy firm will conduct a feasibility study and detail drawings and designs on that part of the construction, and later, it will also monitor the construction work,” Shahjahan said.

In August 2016, the CPA appointed a joint venture comprised of two German firms — Sellhorn Ingenieurgesellschaft mbH and HPC Hamburg Port Consulting GmbH — and a Bangladeshi firm, KS Consultants Limited, to conduct a feasibility study on the Bay Terminal project.

The joint venture submitted the report and a master plan in 2017, describing the project as economically and technically viable. Although the business community has long been demanding that the authorities begin the project as a part of the much-needed expansion of the country’s premier seaport, it got delayed.

It was initially decided that one single firm would build the whole terminal under the Public-Private Partnership (PPP) model. To speed up implementation, the government later decided to divide the project into three parts.

As per the new decision, the CPA will construct a multipurpose terminal while two container terminals will be set up under the PPP model.

Five international port giants, including PSA Singapore, China Merchants Sports Holding Company Ltd, Dubai Ports (DP) World of the UAE, and International Port Development Co-operation of Korea, have expressed interest in funding and constructing the mega project.

Top officials of DP World that met with State Minister for Shipping Khalid Mahmud Chowdhury at his office in Dhaka on August 23 expressed interest in the Chittagong Sea Port, its bay-terminal operations and integrated logistics support.

Other approved projects

The cabinet committee meeting also approved the appointment of a Chinese company for maintenance and toll collection of the “Bangabandhu Sheikh Mujibur Rahman Tunnel” built under the Karnaphuli river in Chattogram.

The same China Communications Construction Company Ltd, which is building the underwater tunnel, was appointed to provide the service for five years at a cost of Tk 983.82 crore.

The deadline for the project is December this year.

The committee also approved the purchase of physical works of three underpasses on the Dhaka-Chattogram highway and U-loop at Paduar Bazar intersection from a joint venture of National Development Engineers Ltd and Hasan Techno Builders Ltd for Tk 289.75 crore.

Tags: Bay Terminalchattogram portChattogram Port Authority (CPA)

Kalpana Pandey

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

India ship entry rules add salvage and pollution-response checks
Customs

India ship entry rules add salvage and pollution-response checks

October 10, 2026
NCT concession keeps ownership with Bangladesh
Asia

NCT concession keeps ownership with Bangladesh, says shipping minister

October 10, 2026
Major Ports Cargo Traffic Climbs 8% in First Half of FY27
Cargo

Major Ports Cargo Traffic Climbs 8% in First Half of FY27 as Growth Gathers Pace

October 10, 2026
Trichy Dry Port Moves Ahead
Cargo

Trichy Dry Port Moves Ahead as Tamil Nadu Shortlists Sites for Multimodal Logistics Hub

October 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post
Central Bank of Sri Lanka to pay for coal imports

As coal piles up at ports, Govt intervention is sought

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.