Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

Longest tunnel on the Delhi-Mumbai expressway nears completion

byKalpana Pandey
March 11, 2025
in Asia, Logistics, News, Transport, Trucking
Reading Time: 2 mins read
#image_title

#image_title

The longest tunnel on the Delhi-Mumbai Expressway, passing through the Mukundra Hills Tiger Reserve in Rajasthan, is almost finished. This tunnel, the first of its kind in India, has eight lanes, divided into two parallel tubes, each with four lanes. It stretches 4.9 km in total, with 3.3 km underground and the remaining 1.6 km built using the cut-and-cover method.

According to a senior National Highways Authority of India (NHAI) official, only 60 metres of excavation remains for Tube-2 (Chechat to Kota), which will be completed within a month. After this, further excavation will be done to increase the tunnel’s width and height in certain sections.

  • Full excavation completion target: June 2025
  • Road construction and additional works to follow
  • Tunnel completion deadline: December 2025

The entire excavation is set to finish by June 2025, after which road construction and other infrastructure work will begin. The tunnel will be equipped with:

  • Modern lighting and sensors
  • Pollution control systems
  • AI-based monitoring
  • Supervisory control and data acquisition

Currently, some areas of the tunnel are narrower, but plans are in place to expand the width from 9 to 19 metres and the height from 8 to 11 metres by March 2025. Security measures, electrical systems, and communication facilities will also be installed.

The Delhi-Mumbai Expressway spans 1,350 km, connecting Mumbai and New Delhi. In Rajasthan, 327 km of the 373 km stretch is already operational. However, the interchanges still need to be built before some sections can open for traffic.

Tags: Delhi-Mumbai ExpresswayExpresswayTunnel

Kalpana Pandey

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

India ship entry rules add salvage and pollution-response checks
Customs

India ship entry rules add salvage and pollution-response checks

October 10, 2026
NCT concession keeps ownership with Bangladesh
Asia

NCT concession keeps ownership with Bangladesh, says shipping minister

October 10, 2026
Major Ports Cargo Traffic Climbs 8% in First Half of FY27
Cargo

Major Ports Cargo Traffic Climbs 8% in First Half of FY27 as Growth Gathers Pace

October 10, 2026
Trichy Dry Port Moves Ahead
Cargo

Trichy Dry Port Moves Ahead as Tamil Nadu Shortlists Sites for Multimodal Logistics Hub

October 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post
Vadhvan Port will be operational by 2030: Ajit Pawar

Vadhvan Port will be operational by 2030: Ajit Pawar

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.