Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

Waterway-5 project flows on

byMaritimegateway
April 29, 2017
in Trending
Reading Time: 3 mins read

The first phase of National Waterway No. 5 project from Kalinga Nagar to Paradip and Dhamra has moved forward with the completion of dredging covering an 11-km stretch in the non-tidal zone of the Kani river.

Dredging has been taken up between Erada and Padanipal in Jajpur and Kendrapara districts, respectively, covering a collective stretch of 36km.

In the first phase, the waterway will be operational between Jokadia near Kalinga Nagar industrial hub and Dhamra and Paradip ports. The length between these destinations is nearly 201km.

Once it becomes operational, the waterway will help industries in Kalinga Nagar and Vyasa Nagar industrial hub and mines in Talcher and Daitary to transport goods using two major ports of the state.

While several steel plants have come up in the Kalinga Nagar region, there are several coalmines in Talcher and iron ore and chromite mines in Daitary.

The Inland Waterways Authority of India had signed an MoU with the state government, Paradip Port Trust and Dhamra Port Company Limited on June 30, 2014, to undertake the first phase of the waterway project.

In the second phase, the stretch between Talcher and Jokadia (131km) will be developed. The Rs 2,000-crore project will cover a distance of 332km in two phases.

The first phase, considered the most viable, will be part of the National Waterway No. 5 that will connect Talcher coalfields to Haldia port in Bengal.

An official said dredging was on in the three stretches of Erada-Angaispur (11km), Angaispur to Badamanatira (14km) and Badamanatira to Padinipal (11km). Dredging has been completed in 2.7km in the first stretch, half kilometre in the second and 7.7km in the third stretch.

Official sources said dredging was slow in the second stretch because of local resistance. Local residents had resisted dredging as once the depth of the river increased it would become impossible to cross the river on foot with their livestock. “The problem has been sorted out and work has picked up. The dredging in the first and third stretches is going on in full swing,” said an official.

The dredging is being carried out to ensure 2-metre water depth in the non-tidal zone of the waterway. The job is expected to be over in July, the official said.

As the dredging goes on, the Inland Waterways Authority has appointed a consultant to prepare engineering design and bid documents for construction of structures such as weir by March next year, he said.

The authorities plans to make the waterway operational by 2020 and trial run will begin by the end of this year.

The authorities will build a temporary terminal at Erada for trial run of the project’s first phase. A patch of land measuring 6.7 acres has been taken on lease basis for the purpose at Erada.

A joint venture company – Inland Water Consortium of Odisha Limited – has been formed with the Odisha government, Paradip Port Trust and Dhamra Port Company Limited as partners for construction and operation of a permanent terminal near Kalinga Nagar. The Inland Waterways Authority has been requested to provide technical support for preparation of request for proposal documents for the construction of the terminal.

Dhamra, however, has already moved forward with its terminal plan. The Dhamra Port Company has constructed a terminal near its port on its own cost, while as of now the Paradip Port Trust will utilise its existing jetty for the purpose. Later, it will construct a permanent terminal.

In January last year, the Inland Waterways Authority of India started trial run of cargo vessel ( MV Lal Bahadur Sastri) from Dhamra in Bhadrak district to Rajnagar in Kendrapara district to gauge the depth of river water and ascertain the possible hindrances on the route in the tidal zone. A 300-tonne barge was supposed to go up to Padanipal, but high-tension overhead power supply line hindered further progress of the vessel from Rajnagar area.

[/vc_column_text]

Tags: Adani PortsDhamra PortParadip

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

India Green Fuel Conclave
News

V.O. Chidambaranar Port Authority hosts India Green Fuel Conclave ’26 to advance India’s green fuel and maritime transition

September 18, 2026
Haryana CM flags off first goods train
Multimodal

Haryana CM flags off first goods train from rail yard at Integrated Multi Modal Logistics Hub in Mahendragarh district

August 24, 2026
SATS plans major investment in India's logistics
Cargo

SATS plans major investment in India’s logistics and manufacturing sector

August 24, 2026
Conoship unveils battery-electric coaster
News

Dutch ship designer Conoship unveils battery-electric coaster with 650-mile range

August 24, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post
May 2017 issue

May 2017

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.