{"id":100035,"date":"2026-08-18T08:48:36","date_gmt":"2026-08-18T03:18:36","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=100035"},"modified":"2026-08-18T08:48:40","modified_gmt":"2026-08-18T03:18:40","slug":"visakha-container-terminal-handles-record-108-out-of-gauge-containers-in-single-vessel-operation","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/visakha-container-terminal-handles-record-108-out-of-gauge-containers-in-single-vessel-operation\/","title":{"rendered":"Visakha Container Terminal handles record 108 Out-of-Gauge containers in single vessel operation"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Visakha Container Terminal has successfully handled its highest-ever volume of Out-of-Gauge cargo in a single vessel operation, marking a significant milestone in its project cargo handling capabilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The operation was carried out for M\/s. Saatvik Solar&#8217;s Gopalpur plant project aboard the break bulk vessel M.V. Hong Yao, with 108 Out-of-Gauge 40-FEU containers safely discharged.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The achievement reflects the team&#8217;s meticulous planning, close inter-departmental coordination and precise execution, ensuring the safe and efficient handling of this specialised cargo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This milestone reinforces Visakha Container Terminal&#8217;s capability to manage high-volume Out-of-Gauge cargo operations and support the evolving logistics requirements of major industrial projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Visakha Container Terminal has successfully handled its highest-ever volume of Out-of-Gauge cargo in a single vessel operation, marking a significant milestone in its project cargo handling capabilities. The operation was carried out for M\/s. Saatvik Solar&#8217;s Gopalpur plant project aboard the break bulk vessel M.V. Hong Yao, with 108 Out-of-Gauge 40-FEU containers safely discharged. The [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":100037,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3385,3407,3386,3401,3,3383,3384,3389,3387],"tags":[132,13668,18169,9949,7833],"class_list":["post-100035","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cargo-news","category-containers","category-logistics-news","category-main-line-operators","category-news","category-ports-news","category-shipping-news","category-technology","category-transport-news","tag-cargo-handling","tag-j-m-baxi","tag-oog-cargo","tag-project-cargo","tag-visakha-container-terminal"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/100035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=100035"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/100035\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/100037"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=100035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=100035"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=100035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}