{"id":107754,"date":"2021-08-30T17:32:47","date_gmt":"2021-08-30T12:02:47","guid":{"rendered":"https:\/\/www.maritimegateway.com\/%e2%82%b937-cr-bridge-planned-in-kanniyakumari\/"},"modified":"2021-08-30T17:32:47","modified_gmt":"2021-08-30T12:02:47","slug":"%e2%82%b937-cr-bridge-planned-in-kanniyakumari","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/%e2%82%b937-cr-bridge-planned-in-kanniyakumari\/","title":{"rendered":"\u20b937 cr. bridge planned in Kanniyakumari"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A pedestrian marine bridge linking the Vivekananda Rock Memorial and the Thiruvalluvar statue in Kanniyakumari will be constructed at a cost of \u20b937 crore, said Minister for Public Works E.V. Velu He also holds the portfolio of Minor Ports.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He told the Assembly that the construction of the 140-m bridge would be carried out under the Sagarmala\/Coastal Berth Scheme, with 50% financial assistance from the Union government and another 50% from the State government.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe construction and maintenance wing of the Highways Department will execute the project after completing the tender process,\u201d Mr. Velu said during a debate on demand for grants for his Department.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He said the jetty at the Vivekananda Rock would be extended at \u20b920 crore under a similar scheme to attract more tourists.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He said Poompuhar Shipping Corporation Ltd., operating three ferry services from Kanniyakumari shores to Vivekananda Rock and Thiruvalluvar statue, would now operate two more.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source : <strong>The Hindu<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A pedestrian marine bridge linking the Vivekananda Rock Memorial and the Thiruvalluvar statue in Kanniyakumari will be constructed at a cost of \u20b937 crore, said Minister for Public Works E.V. Velu He also holds the portfolio of Minor Ports. He told the Assembly that the construction of the 140-m bridge would be carried out under [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[21128],"class_list":["post-107754","post","type-post","status-publish","format-standard","hentry","category-news","tag-coastal-berth-schemelogistics-newssagarmala"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/107754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=107754"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/107754\/revisions"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=107754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=107754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=107754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}