{"id":107963,"date":"2021-09-27T02:08:11","date_gmt":"2021-09-26T20:38:11","guid":{"rendered":"https:\/\/www.maritimegateway.com\/adani-and-reliance-to-manufacture-solar-gigafabs\/"},"modified":"2026-09-14T23:12:32","modified_gmt":"2026-09-14T17:42:32","slug":"adani-and-reliance-to-manufacture-solar-gigafabs","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/adani-and-reliance-to-manufacture-solar-gigafabs\/","title":{"rendered":"Adani and Reliance to manufacture solar gigafabs"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The government\u2019s\u00a0production-linked incentives scheme\u00a0for gigawatt-scale manufacturing of high-efficiency solar modules has received bids for an overwhelming 54.8 GW of capacity with participation from existing manufacturers and new players alike. Out of the total 18 bidders, half are new to solar manufacturing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the shortlist,\u00a0Adani\u00a0Infrastructure, Jindal India Solar,\u00a0Reliance New Energy, and Shirdi Sai Electricals are the highest scorers with each of them winning 100 marks\u2014owing to the fact they offered full extent of integration up to polysilicon manufacturing stage (50 marks) and a maximum capacity of 4 GW each (another 50 marks). USA-based thin-film module\u00a0First Solar\u00a0is also a strong contender with 90 marks (50 marks awarded for full integration plus 40 marks for 3 GW proposed capacity).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Also on the shortlist are\u00a0Coal India Limited,\u00a0CubicPV,\u00a0Larsen and Toubro, and\u00a0ReNew Power, which submitted bids for module fabs integrated up to ingots-wafers manufacturing from outsourced polysilicon. And\u00a0Avaada Energy,\u00a0Acme Solar,\u00a0Emmvee PV, Jupiter Solar, Megha Engineering,\u00a0Premier Energies,\u00a0Tata Power Solar,\u00a0Vikram Solar, and\u00a0Waaree Energies\u00a0as bidders for cell and module manufacturing (please see the below chart released by JMK Research).<\/p>\n\n\n\n<figure class=\"wp-block-image\" id=\"attachment_62606\"><img decoding=\"async\" src=\"https:\/\/wspn120su8v3hf3mw41faiww-wpengine.netdna-ssl.com\/wp-content\/uploads\/sites\/8\/2021\/09\/PLI-600x253.jpg\" alt=\"\" class=\"wp-image-62606\"\/><figcaption>Bid Capacities and Total Marks Assigned under Solar Manufacturing PLI Scheme<em>JMK Research<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe bidder\/manufacturer getting higher marks will get preference in the allocation of manufacturing capacity under the PLI scheme. In case of equal marks, the bidder\/manufacturer quoting the least total PLI amount for five years\u2019 period, followed by a higher \u2018Extent of integration\u2019 followed by higher \u2018Manufacturing Capacity,\u2019 will get priority in the selection,\u201d as per the PLI bid document.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The shortlisted applicants will lodge bids based on the level of PLI funding they will require for five years after their planned factories are commissioned.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The maximum incentive to a single manufacturer will be tied to 2 GW of its annual production capacity or half of the planned output of its facility, whichever is lower. That cap will ensure at least three solar manufacturers can benefit from the INR4,500 crore pot.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source : <strong>PV Magazine<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The government\u2019s\u00a0production-linked incentives scheme\u00a0for gigawatt-scale manufacturing of high-efficiency solar modules has received bids for an overwhelming 54.8 GW of capacity with participation from existing manufacturers and new players alike. Out of the total 18 bidders, half are new to solar manufacturing. In the shortlist,\u00a0Adani\u00a0Infrastructure, Jindal India Solar,\u00a0Reliance New Energy, and Shirdi Sai Electricals are the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[21370],"class_list":["post-107963","post","type-post","status-publish","format-standard","hentry","category-news","tag-adanijindal-solarproduction-linked-incentives-pli-schemereliancesolar-modules"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/107963","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=107963"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/107963\/revisions"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=107963"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=107963"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=107963"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}