{"id":108531,"date":"2021-12-03T01:56:56","date_gmt":"2021-12-02T20:26:56","guid":{"rendered":"https:\/\/www.maritimegateway.com\/adani-irb-bag-ganga-expressway-project\/"},"modified":"2026-09-14T22:57:50","modified_gmt":"2026-09-14T17:27:50","slug":"adani-irb-bag-ganga-expressway-project","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/adani-irb-bag-ganga-expressway-project\/","title":{"rendered":"Adani &#038; IRB bag Ganga Expressway project"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Adani Enterprises and IRB Infrastructure Developers on Wednesday emerged as the preferred bidders for developing the\u00a0594 km Ganga Expressway\u00a0connecting Meerut and Prayagraj on the public-private partnership (PPP) mode under Design, Built, Finance, Operate and Transfer (DBFOT) basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This six lane access-controlled expressway by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) will have a 120m ROW (right of way) and is designed to be expandable to 8 lanes in the future. More design details can be\u00a0viewed here.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ganga Expressway\u2019s Phase 1 has been divided up into 4 groups for development with each group comprising of 3 civil packages. The concession period is 30 years and land acquisition progress currently stands at 94% completion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Quick Summary<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Detailed information on each group with maps for each\u00a0can be viewed here.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Group 1<\/strong>: IRB Infrastructure Developers (Meerut \u2013 Amroha districts, 129.700 km)<\/li><li><strong>Group 2<\/strong>: Adani Enterprises (Budaun \u2013 Hardoi districts, 151.700 km)<\/li><li><strong>Group 3<\/strong>: Adani Enterprises (Hardoi \u2013 Unnao districts, 155.700 km)<\/li><li><strong>Group 4<\/strong>: Adani Enterprises (Unnao \u2013 Prayagraj districts, 156.947 km)<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">UPEIDA\u00a0invited RFQ applications\u00a0in March 2021 with a 3 year deadline. The rudimentary route maps displayed below are straight from the tender document and give a rough idea about the expressway\u2019s alignment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Technical bids\u00a0were opened by UPEIDA\u00a0last week reveal they received a total of 12 bids \u2013 one for each group \u2013 from Adani, Ashoka Buildcon and IRB.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Financial Bid (Grant) Values by Group<\/strong>&nbsp;<strong>(Rs. Crore)<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><strong>Adani<\/strong><\/td><td><strong>IRB<\/strong><\/td><td><strong>Ashoka<\/strong><\/td><\/tr><tr><td>1<\/td><td>1865<\/td><td><strong>1782<\/strong><\/td><td>1960<\/td><\/tr><tr><td>2<\/td><td><strong>1950<\/strong><\/td><td>2061<\/td><td>2185<\/td><\/tr><tr><td>3<\/td><td><strong>2197<\/strong><\/td><td>2250<\/td><td>2301<\/td><\/tr><tr><td>4<\/td><td><strong>2099<\/strong><\/td><td>2160<\/td><td>2211<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/themetrorailguy.com\/wp-content\/uploads\/2021\/02\/GangaExpresswayMap2.jpg\" alt=\"\"\/><figcaption><em>Ganga Expressway\u2019s alignment \u2013 via UPEIDA<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On the Meerut-end, the expressway will be connected to the\u00a0Delhi \u2013 Meerut Expressway\u2019s upcoming Phase 5. That phase envisions the construction of a 14.60 km Zainuddinpur to Jahidpur connector and\u00a0APS Hydro emerged as its lowest bidder\u00a0in November. On the eastern-end, the expressway will end at Prayagraj Bypass.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source : <strong>The Metro Rail Guy<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Adani Enterprises and IRB Infrastructure Developers on Wednesday emerged as the preferred bidders for developing the\u00a0594 km Ganga Expressway\u00a0connecting Meerut and Prayagraj on the public-private partnership (PPP) mode under Design, Built, Finance, Operate and Transfer (DBFOT) basis. This six lane access-controlled expressway by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) will have a 120m ROW [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[22007],"class_list":["post-108531","post","type-post","status-publish","format-standard","hentry","category-news","tag-adani-enterprisesganga-expresswayirb-infrastructure-developers"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/108531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=108531"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/108531\/revisions"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=108531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=108531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=108531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}