{"id":11614,"date":"2018-03-15T12:19:29","date_gmt":"2018-03-15T06:49:29","guid":{"rendered":"http:\/\/www.maritimegateway.com\/?p=11614"},"modified":"2018-03-15T12:19:29","modified_gmt":"2018-03-15T06:49:29","slug":"nhai-awards-rs-1047-cr-dwarka-expressway-package-lt","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/nhai-awards-rs-1047-cr-dwarka-expressway-package-lt\/","title":{"rendered":"NHAI awards Rs 1,047 cr Dwarka Expressway package to L&#038;T"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The National Highways Authority of India (NHAI) has awarded to L&amp;T one of the five packages of Rs 7,500 crore Dwarka Expressway project in Haryana under the Bharatmala project, the government said today. The package to build eight-lane expressway from Basai RoB to NH 8 \u2013 SPR intersection in Haryana will be executed at a cost of Rs 1,047 crore under EPC (engineering, construction and procurement) mode, Ministry of Road Transport and Highways said in a statement. \u201cThe NHAI has issued Letter of Award \u2013 LOA for Package-4 of Dwarka Expressway from Basai RoB to NH-8 \u2013 SPR intersection in Haryana on EPC under Bharatmala Pariyojna\u2026This eight-lane Expressway (NH-248 BB) will be constructed on EPC Mode at a cost of Rs 1047.007 crore. The 8.76 km stretch of the road will be constructed by L&amp;T,\u201d the statement said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Development of this section of Dwarka Expressway will ensure seamless and safe movement of traffic between Delhi-Gurgaon and help in decongestion of the Delhi-Gurugaon Expressway, it said. The project comprises of 8-lane elevated structure for main carriageway of Dwarka Expressway, Trumpet Interchange for Manesar Road and Cloverleaf interchange with NH-8-SPR intersection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The completion period of the project is two years with maintenance period of four years. Under the project, a minor bridge will be widened, additional ROBs, five VUP (vehicle underpass), six Bus Bays with Bus Shelter will be erected and four Junction Improvements will be carried out, it said. \u201cDwarka Expressway has to be implemented in 5 Packages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first package of 5.3 kms is from Shiv Murti to RuB, the second of 4.2 kms from RuB to Haryana border, package 3 from Haryana border to BasaiRoB \u2013 10.2 Kms, package 4 from Basai RoB to NH-8 \u2013 SPR intersection \u2013 8.77 Kms, and the fifth package \u2013 5 kms of Western Airport Connectivity from Dwarka Expressway through tunnel,\u201d the statement said. The Expressway is proposed to be built at an estimated expenditure of Rs 7,500 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The National Highways Authority of India (NHAI) has awarded to L&amp;T one of the five packages of Rs 7,500 crore Dwarka Expressway project in Haryana under the Bharatmala project, the government said today. The package to build eight-lane expressway from Basai RoB to NH 8 \u2013 SPR intersection in Haryana will be executed at a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[225],"class_list":["post-11614","post","type-post","status-publish","format-standard","hentry","category-news","tag-nhai"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/11614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=11614"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/11614\/revisions"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=11614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=11614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=11614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}