{"id":17432,"date":"2020-06-02T13:35:58","date_gmt":"2020-06-02T08:05:58","guid":{"rendered":"http:\/\/www.maritimegateway.com\/?p=17432"},"modified":"2020-06-02T13:35:58","modified_gmt":"2020-06-02T08:05:58","slug":"port-rotterdam-installs-new-rail-bridge","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/port-rotterdam-installs-new-rail-bridge\/","title":{"rendered":"Port of Rotterdam installs new rail bridge"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Port of Rotterdam Authority has announced the successful installation of the new arch bridge spanning the Thomassentunnel and the A15 and N15 motorways, whose structure was in place by the evening of 30 May 2020.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The railway bridge forms a key link in the Theemswegtrac\u00e9, a new branch of the port railway line that is over 4km in length. The Theemswegtrac\u00e9 is a \u20ac300 million (US$333 million) solution to the problems associated with the Calandbrug near Rozenburg, according to the Dutch authorities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This steel vertical-lift bridge for rail and road traffic in the Port of Rotterdam area is the connecting link in the Betuwe Route to the European hinterland. For ocean shipping, the vertical-lift bridge forms the gateway to the Brittanni\u00ebhaven.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe Theemswegtrac\u00e9 is in line with the Port Authority\u2019s policy to increase the sustainability of Rotterdam\u2019s connections with the hinterland and raise efficiency in rail, road and shipping traffic,\u201d said Ronald Paul, COO of the Port of Rotterdam Authority.<\/p>\n\n\n\n<article id=\"node-31588\" class=\"node node-por-ct-news node-promoted view-mode-full view-mode-full\">\n<div class=\"l-container\">\n<div class=\"l-container__content graph__content\">\n<p>The first bridge along this route \u2013 spanning Rozenburgsesluis \u2013 was installed on 4 April 2020, while the first trains are expected to travel down the Theemswegtrac\u00e9 in late 2021.<\/p>\n<p>This second bridge, of which the steel structure alone weighs 4,100tonnes, is 269m long, 13.7m wide and 28m tall, was built by Hollandia, a company based in Krimpen aan den IJssel.<\/p>\n<\/div>\n<\/div>\n<\/article>\n\n\n\n<div class=\"paragraphs-items paragraphs-items-field-building-bricks paragraphs-items-field-building-bricks-full paragraphs-items-full\">\n<div class=\"entity entity-paragraphs-item paragraphs-item-media-embed paragraph paragraph-media-embed bg-color--white bg-color--none single bg-color-theme--none\">\n<div class=\"paragraphs-items paragraphs-items-field-par-media-embed-field paragraphs-items-field-par-media-embed-field-full paragraphs-items-full\">\n<div class=\"entity entity-paragraphs-item paragraphs-item-media-embed-field paragraph paragraph-media-embed-field bg-color--none bg-color--none\">\n<div class=\"paragraph__content\">\n<div id=\"file-53941\" class=\"file file-video file-video-oembed\">\n<div class=\"content\">\n<p>\u201cIn view of the forecast growth in rail freight transport and the increase in shipping movements from and to Brittanni\u00ebhaven, the Port Authority believes that rail transport could run into capacity problems. The construction of the Theemsweg Route resolves this bottleneck,\u201d added Ronald Paul.<\/p>\n<p>SaVe is a construction consortium made up of BESIX, Dura Vermeer, Mobilis, Hollandia and Iemants and is constructing the substructure of the Theemsweg Route, a 4-kilometre stretch of concrete viaduct and two steel arched bridges, commissioned by the Port of Rotterdam Authority.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Port of Rotterdam Authority has announced the successful installation of the new arch bridge spanning the Thomassentunnel and the A15 and N15 motorways, whose structure was in place by the evening of 30 May 2020. The railway bridge forms a key link in the Theemswegtrac\u00e9, a new branch of the port railway line that [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":17433,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[2001,2185],"class_list":["post-17432","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-port-of-rotterdam","tag-supply-chain"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/17432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=17432"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/17432\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/17433"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=17432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=17432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=17432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}