{"id":18553,"date":"2020-07-26T18:10:43","date_gmt":"2020-07-26T12:40:43","guid":{"rendered":"http:\/\/www.maritimegateway.com\/?p=18553"},"modified":"2020-07-26T18:10:43","modified_gmt":"2020-07-26T12:40:43","slug":"electrified-double-stack-container-tunnel-near-haryana","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/electrified-double-stack-container-tunnel-near-haryana\/","title":{"rendered":"Electrified double-stack container tunnel near Haryana"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">July 26, 2020: A one-km-long tunnel has been cut through the Aravallis on the railway&#8217;s Western Dedicated Freight Corridor near Haryana&#8217;s Sohna with a plan to ply electric goods train with double-stack containers through it in the next 12 months.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once operational, a double-stack container goods train will be able to run at a speed of more than 100 kmph in this tunnel. It connects Mewat and Gurgaon districts of Haryana, and negotiates a steep gradient on the uphill and downhill slope of the Aravalli range.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The D-shaped tunnel has a cross-sectional area of 150 square metres to accommodate double line with higher overhead equipment to enable double-stack container movement on the freight corridor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cross-sectional area wise, it is one of the biggest railway tunnels in India. One end of the tunnel is near Rewari while the other end is at Dadri.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are a total of six tunnels in both the Eastern and Western Dedicated Freight Corridors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source: Economic Times<\/p>\n","protected":false},"excerpt":{"rendered":"<p>July 26, 2020: A one-km-long tunnel has been cut through the Aravallis on the railway&#8217;s Western Dedicated Freight Corridor near Haryana&#8217;s Sohna with a plan to ply electric goods train with double-stack containers through it in the next 12 months. Once operational, a double-stack container goods train will be able to run at a speed [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7655,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[],"class_list":["post-18553","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/18553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=18553"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/18553\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/7655"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=18553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=18553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=18553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}