{"id":53839,"date":"2022-10-03T06:51:24","date_gmt":"2022-10-03T01:21:24","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=53839"},"modified":"2022-10-03T06:51:26","modified_gmt":"2022-10-03T01:21:26","slug":"haropa-port-welcomes-finnlines-firsthybrid-ro-ro-vessel","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/haropa-port-welcomes-finnlines-firsthybrid-ro-ro-vessel\/","title":{"rendered":"HAROPA PORT welcomes Finnlines firsthybrid Ro-Ro vessel"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">An exceptional call by Finnlines at Le Havre: HAROPA PORT welcomes the shipping line\u2019s first hybrid RoRo vessel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finnlines has made a mid-September call at the port of Le Havre as part of its rotation linking Finland and Spain. This is the Finnish shipping line\u2019s very first call at Le Havre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The FINNECO III called at Le Havre&#8217;s RoRo terminal and was processed by stevedores SMR who are<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">specialists in ferry and RoRo operations. Welcoming this vessel illustrates the partnership established between the Grimaldi Group and HAROPA PORT and opens the way to future decarbonized port calls at Le Havre\u2019s RoRo terminal, underpinning the development of the automotive industry and its associated logistics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Le FINNECO III: a latest-generation hybrid RoRo vessel<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Finnish-flagged FINNECO III is a vessel in the Grimaldi Green 5th Generation \u2013 RoRo class, along with its two twin sister ships. Equipped with the latest technologies, this FINNECO III, which was delivered last May, allows a maximum reduction in the carbon footprint of its rotations to be achieved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Characteristics of Finneco series:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5,800 lm &#8211; the equivalent of 400 trailers<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Modular construction with hydraulically adjustable decks<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Up to 7m height<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hybrid &#8211; lithium-ion batteries and 600 sq.m. of solar panels<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The acquisition of these new hybrid vessels is testimony to the Grimaldi Group\u2019s desire to contribute to the energy transition and the move towards decarbonized maritime transport.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Le Havre RoRo terminal<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25ba A 104-hectare terminal, 24\/7 access<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25ba 10 dedicated quays<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25ba Technical centers with value-added services<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u25ba Secure \u2013 meets ISPS standards<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An exceptional call by Finnlines at Le Havre: HAROPA PORT welcomes the shipping line\u2019s first hybrid RoRo vessel. Finnlines has made a mid-September call at the port of Le Havre as part of its rotation linking Finland and Spain. This is the Finnish shipping line\u2019s very first call at Le Havre. The FINNECO III called [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":53840,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3426,3393,3386,3,3383,3413],"tags":[8893,790,6134],"class_list":["post-53839","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-europe","category-exim-news","category-logistics-news","category-news","category-ports-news","category-supply-chain-news","tag-finnlines","tag-haropa-ports","tag-le-havre-port"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/53839","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=53839"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/53839\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/53840"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=53839"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=53839"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=53839"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}