{"id":56301,"date":"2022-12-14T08:57:47","date_gmt":"2022-12-14T03:27:47","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=56301"},"modified":"2022-12-14T08:57:48","modified_gmt":"2022-12-14T03:27:48","slug":"dredging-of-barak-river-underway","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/dredging-of-barak-river-underway\/","title":{"rendered":"Dredging of Barak river underway"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The assured depth dredging work of river Barak (NW-16) from Badarpur to Bhanga (10.5 km) has been awarded to Dredging Corporation of India. The scheduled completion of the work of upgradation\/ renovation of Badarpur &amp; Karimganj terminals is March 2023.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"380\" src=\"https:\/\/maritimegateway.com\/staging\/staging\/wp-content\/uploads\/2022\/12\/Barak-river-dredging-1200x380.jpg\" alt=\"\" class=\"wp-image-56302\" srcset=\"https:\/\/maritimegateway.com\/staging\/wp-content\/uploads\/2022\/12\/Barak-river-dredging-1200x380.jpg 1200w, https:\/\/maritimegateway.com\/staging\/wp-content\/uploads\/2022\/12\/Barak-river-dredging-600x190.jpg 600w, https:\/\/maritimegateway.com\/staging\/wp-content\/uploads\/2022\/12\/Barak-river-dredging-768x243.jpg 768w, https:\/\/maritimegateway.com\/staging\/wp-content\/uploads\/2022\/12\/Barak-river-dredging.jpg 1322w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The assured depth dredging work of river Barak (NW-16) from Badarpur to Bhanga (10.5 km) has been awarded to Dredging Corporation of India. The scheduled completion of the work of upgradation\/ renovation of Badarpur &amp; Karimganj terminals is March 2023.<\/p>\n","protected":false},"author":22,"featured_media":41732,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3,3423],"tags":[9218,46],"class_list":["post-56301","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-waterways-news","tag-barak-river","tag-dredging"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/56301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=56301"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/56301\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/41732"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=56301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=56301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=56301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}