{"id":58024,"date":"2023-01-31T09:10:13","date_gmt":"2023-01-31T03:40:13","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=58024"},"modified":"2023-01-31T09:10:15","modified_gmt":"2023-01-31T03:40:15","slug":"j-m-baxi-heavy-delivers-the-living-quarters-module-for-ongc-offshore-field","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/j-m-baxi-heavy-delivers-the-living-quarters-module-for-ongc-offshore-field\/","title":{"rendered":"J M Baxi Heavy delivers the living quarters module for ONGC offshore field"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">J M Baxi Heavy successfully completed the load out of a living quarters module, to be installed at Bombay high offshore field for ONGC. The modules weighing 3900 ton was loaded out at the L&amp;T Hazira yard with the help of 180 axles. This is the last of 7 modules loaded out for the NLRNC Mumbai high project. All the modules weighing a total of 22,860 tons or 440000 freight ton were transported within a short span of 45 days using a total of 1130 axles.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>J M Baxi Heavy successfully completed the load out of a living quarters module, to be installed at Bombay high offshore field for ONGC. The modules weighing 3900 ton was loaded out at the L&amp;T Hazira yard with the help of 180 axles. This is the last of 7 modules loaded out for the NLRNC [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":58025,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[3192],"class_list":["post-58024","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-jm-baxi-group"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/58024","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=58024"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/58024\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/58025"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=58024"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=58024"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=58024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}