{"id":59817,"date":"2023-03-24T10:07:35","date_gmt":"2023-03-24T04:37:35","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=59817"},"modified":"2023-03-24T10:07:37","modified_gmt":"2023-03-24T04:37:37","slug":"algeria-to-build-1000-km-rail-for-iron-transport","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/algeria-to-build-1000-km-rail-for-iron-transport\/","title":{"rendered":"Algeria to build 1,000-km rail for iron transport"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Algeria is planning to construct a 1,000-km rail network to transport iron ore from its largest mine in the Western part of the North African Arab country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A government technical committee visited the planned rail site on Tuesday and will conduct a study on the route of the rail line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The railway will link \u2018G\u00e2ra Djebilet\u2019 mine in the western Tindouf province with Bechar province in Northwest Algeria, the paper said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe project involves the construction of a railway that will stretch around 1,000 km to transport iron ore from the mine in Tindouf to Bechar,\u201d the paper added with mentioning when the project would be launched. G\u00e2ra Djebilet, which was commissioned in mid-2022, is one of the world\u2019s largest iron ore reservoirs, with estimated reserves of nearly 3.5 billion tonnes, of which around 1.7 billion tonnes are exploitable.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Algeria is planning to construct a 1,000-km rail network to transport iron ore from its largest mine in the Western part of the North African Arab country. A government technical committee visited the planned rail site on Tuesday and will conduct a study on the route of the rail line. The railway will link \u2018G\u00e2ra [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":48099,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3428,3408,3393,3],"tags":[2145,551,1775],"class_list":["post-59817","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-africa-shipping-news","category-dry-bulk","category-exim-news","category-news","tag-dry-bulk-cargo","tag-iron-ore","tag-rail-freight"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/59817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=59817"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/59817\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/48099"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=59817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=59817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=59817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}