{"id":60132,"date":"2023-04-04T07:27:21","date_gmt":"2023-04-04T01:57:21","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=60132"},"modified":"2023-04-04T07:27:23","modified_gmt":"2023-04-04T01:57:23","slug":"apm-terminals-expands-container-terminal-in-rotterdam","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/apm-terminals-expands-container-terminal-in-rotterdam\/","title":{"rendered":"APM Terminals expands container terminal in Rotterdam"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The project involves a site of approximately 475,000 m\u00b2 with 1,000 metres of deep-sea quay, while the Port of Rotterdam Authority is now constructing the new quay walls, which will be completed by mid-2024.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The expansion project is anticipated to be completed in the second half of 2026, increasing the Dutch terminal&#8217;s capacity by approximately 2 million TEUs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The additional section of the terminal will operate with net-zero emissions and be fully automated and prepared for shore power installation, according to a statement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A.P. Moller &#8211; Maersk already leased 185,000 m\u00b2 of property in the same region last year for the construction of cross-dock and cold storage facilities, which will open in 2024.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to the new terminal site, an empty depot of around 16,000 m\u00b2 will also be built for Star Container Services, a subsidiary of A.P. Moller &#8211; Maersk, in the area immediately alongside APM Terminals Maasvlakte II.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are very pleased with APM Terminals\u2019 decision to expand the terminal and to choose Rotterdam as the hub for its Western European operations,&#8221; stated Allard Castelein, CEO of the Port of Rotterdam Authority.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project involves a site of approximately 475,000 m\u00b2 with 1,000 metres of deep-sea quay, while the Port of Rotterdam Authority is now constructing the new quay walls, which will be completed by mid-2024. The expansion project is anticipated to be completed in the second half of 2026, increasing the Dutch terminal&#8217;s capacity by approximately [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":32585,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3395,3396,3426,3386,3,3383,3413],"tags":[811,572,2023],"class_list":["post-60132","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bulk-ports","category-container-terminals","category-europe","category-logistics-news","category-news","category-ports-news","category-supply-chain-news","tag-apm-terminals","tag-maersk","tag-rotterdam-port"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/60132","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=60132"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/60132\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/32585"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=60132"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=60132"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=60132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}