{"id":63610,"date":"2023-07-14T10:00:15","date_gmt":"2023-07-14T04:30:15","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=63610"},"modified":"2023-07-14T10:00:16","modified_gmt":"2023-07-14T04:30:16","slug":"call-for-expression-of-interest-for-electric-harbour-craft-in-singapore","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/call-for-expression-of-interest-for-electric-harbour-craft-in-singapore\/","title":{"rendered":"Call for expression of interest for electric harbour craft in Singapore"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">MPA aims to support harbour craft companies by providing e-HC engineering reference designs and safety standards to adopt, as well as helping the companies access more attractive financing solutions and lower the cost of production through aggregating overall demand for e-HC in the sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Also, through EOI, MPA will assess and validate proposals for the best-in-class e-HC reference designs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These reference designs will complement the e-HC engineering knowledge and local capabilities developed by the joint industry-research consortiums supported by MPA and the Singapore Maritime Institute as well as other industry-led collaborations on research and development of e-HC for various use cases. MPA Singapore said, &#8220;The suitability of electrification as a decarbonisation pathway depends on several factors, including the operating profile and energy requirements of the harbour craft.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MPA aims to support harbour craft companies by providing e-HC engineering reference designs and safety standards to adopt, as well as helping the companies access more attractive financing solutions and lower the cost of production through aggregating overall demand for e-HC in the sector. Also, through EOI, MPA will assess and validate proposals for the [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":55663,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3],"tags":[10526,7593],"class_list":["post-63610","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-news","tag-electric-harbour-craft","tag-singapore-port-authority"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/63610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=63610"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/63610\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/55663"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=63610"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=63610"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=63610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}