{"id":63775,"date":"2023-07-20T10:25:29","date_gmt":"2023-07-20T04:55:29","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=63775"},"modified":"2023-07-20T10:25:31","modified_gmt":"2023-07-20T04:55:31","slug":"nhai-to-auction-300-km-of-road-assets","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/nhai-to-auction-300-km-of-road-assets\/","title":{"rendered":"NHAI to auction 300 km of road assets"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Roads under ToT 13 &amp; 14 include 28-km long Kota Bypass (NH76) and 81-km long Gwalior-Jhansi (NH75) under ToT13; and 60-km long Delhi-Meerut Expressway (NH-334 DME), 51-km long DelhiHapur section (NH-24 &amp; part of DME) and 79-km long Binjabahal-Teleibani road (NH6). Bids are expected by September.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ToT 13 &amp; 14 bundles are likely to be valued at \u20b96000-7000 crore, said people aware of the development. Mail sent to NHAI did not elicit any responses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kota Bypass has an annual collection of \u20b948 crore while Gwalior-Jhansi stretch earns Rs96 crore annually. Delhi-Meerut Expressway, Delhi-Hapur section and Binjabahal-Teleibani road have collections of \u20b9137 crore, \u20b9258 crore and \u20b979 crore respectively. Out of the 6-lakh crore National Monetization Pipeline (NMP) of FY2022-25, about \u20b960 lakh crore from monetization of road assets has been estimated. NHAI has been mandated to raise \u20b943,979 crore from asset monetization during FY24.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The monetization of ToT 11 &amp; 12 bundles is already under process and NHAI is evaluating the bids.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bids for the 361-km long Lalitpur-Lakhnadon stretch of NH26 in Madhya Pradesh and 82-km long Allahabad Bypass asset were submitted in June.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A clutch of global investors including Canadian fund CDPQ, KKR, Cube Highways and domestic road operator IRB Infrastructure Developers are interested in acquiring 361-km long highway assets under ToT 12 auction by The National Highway Authority of India (NHAI), ET reported last month.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Till date, NHAI has awarded six TOT Bundles (TOT-1, 3, 5A1, 5A2, 7 &amp; 9) and raised Rs. 26,366 crore from bids invited for 11 TOT bundles. TOT bundle 2,4,6,8 &amp; 10 were annulled due to bids being lower than the initial estimated concession value (IECV or Reserve Price) determined by NHAI.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Roads under ToT 13 &amp; 14 include 28-km long Kota Bypass (NH76) and 81-km long Gwalior-Jhansi (NH75) under ToT13; and 60-km long Delhi-Meerut Expressway (NH-334 DME), 51-km long DelhiHapur section (NH-24 &amp; part of DME) and 79-km long Binjabahal-Teleibani road (NH6). Bids are expected by September. ToT 13 &amp; 14 bundles are likely to be [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":39920,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3386,3],"tags":[349,225],"class_list":["post-63775","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-logistics-news","category-news","tag-highway-projects","tag-nhai"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/63775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=63775"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/63775\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/39920"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=63775"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=63775"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=63775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}