{"id":64076,"date":"2023-08-03T08:49:07","date_gmt":"2023-08-03T03:49:07","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=64076"},"modified":"2023-08-03T08:49:08","modified_gmt":"2023-08-03T03:49:08","slug":"indian-railways-to-link-mizoram-to-myanmar","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/indian-railways-to-link-mizoram-to-myanmar\/","title":{"rendered":"Indian Railways to link Mizoram to Myanmar"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Railway Board has recently accorded its approval for the Final Location Survey (FLS) of the 223 km, Sairang (Aizawl) to Hbichhuah in Mizoram, near the Myanmar border.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8221;Considering the strategic importance of the region and vis-\u00e0-vis economic development, the Ministry of Railways has decided to take up the project. This project will provide one more access to Northeast India through Hbichhuah. <strong>&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Northeast Frontier Railway said that it will lower the cost and time of transportation of goods via Sittwe Port in Myanmar to the Northeast.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8221;N F Railway is currently executing a 51.38 km long broad-gauge railway line project between Bairabi and Sairang, work for which is going on in full swing,&#8221; it added.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another, final location survey of the 111 km long Imphal \u2013 Moreh railway line connectivity project along the Myanmar Border is also expected to be completed soon. The proposed new broad-gauge line will promote trade connectivity and ties between India and Myanmar and the wider region. It will also help in boosting the economic development of Northeast states.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Railway Board has recently accorded its approval for the Final Location Survey (FLS) of the 223 km, Sairang (Aizawl) to Hbichhuah in Mizoram, near the Myanmar border. &#8221;Considering the strategic importance of the region and vis-\u00e0-vis economic development, the Ministry of Railways has decided to take up the project. This project will provide one more [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":41040,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3386,3,3418,3413],"tags":[1785,7502,8177,7285,8706],"class_list":["post-64076","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-logistics-news","category-news","category-rail-news","category-supply-chain-news","tag-indian-railways","tag-mizoram","tag-myanmar-trade","tag-northeast-frontier-railway","tag-railway-lines"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/64076","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=64076"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/64076\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/41040"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=64076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=64076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=64076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}