{"id":66620,"date":"2023-10-26T08:19:39","date_gmt":"2023-10-26T02:49:39","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=66620"},"modified":"2023-10-26T08:19:40","modified_gmt":"2023-10-26T02:49:40","slug":"western-dfc-to-be-ready-by-fy24-end","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/western-dfc-to-be-ready-by-fy24-end\/","title":{"rendered":"Western DFC to be ready by FY24 end"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Designed exclusively for freight transportation, DFC will decongest the existing network of Indian Railways as goods train will start moving on the corridor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Dedicated Freight Corridor Corporation of India Limited (DFCCIL) has completed 1,279km of the total 1,506km long stretch of WDFC that will connect the Jawaharlal Nehru Port Terminal (JNPT), Mumbai to Dadri.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe have achieved another milestone as we have completed the trial run of goods train on the newly constructed railway electrified section connecting Gothangam to Makarpura,\u201d DFCCIL\u2019s director (infrastructure) Hari Mohan Gupta, said in an exclusive interview with TOI.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gupta said that the new railway section costing around Rs 3,644 crore, spanning 117km through Surat, Bharuch and Vadodara districts of Gujarat, will see regular movement of goods trains soon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cOf the total 565km stretch that falls under Gujarat, we have just 170km stretch which is pending. We will be completing it within the current financial year \u2013 March 31, 2024,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe section connecting New Dadri in Uttar Pradesh to Sanand (North) near Ahmedabad has already been commissioned. Around 90 trains are running everyday on this section. All the key ports of Gujarat \u2013 Mundra, Kandla, Pipapav, Dahej and Hazira are already connected with WDFC. The containers which used to take 35 hours to reach Delhi-NCR from Gujarat port now take less than 12 hours,\u201d said Gupta, adding that the reduction in transportation time has also resulted in reduction in logistic cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe work to connect Sanand (N) to Makarpura, a 138km-long section, is going on in full swing and we will completing it within this financial year,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On the Makarpura-Gothangam section, on which the trial runs of goods trains have begun, DFCCIL has connected IR\u2019s Gothangam station to DFC Gothangam and DFC Gothangam to DFC Makarpura which in turn is connected to IR\u2019s Makarpura station.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cNow, as regular goods train movement starts, offloading of goods train will start right from Gothangam and we will be handing over the commodities to IR Makarpura. Apart from the freight connectivity, the biggest advantage will be on the front of enhancing speed of passenger train to 160 km per hour. As the goods train will divert to DFC, there will be significant time to upgrade the existing railway infrastructure to achieve the 160 km per hour speed,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As DFCCIL targets to complete around 30km stretch from Gothangam to Bhesthan next month, it expects to connect Makarpura to Gholvad in Maharashtra within this calendar year. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We are confident of completing the Gholvad-Saphale section in the current financial year thereby providing a complete connectivity between Sanand (N) to Saphale,\u201d he added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Designed exclusively for freight transportation, DFC will decongest the existing network of Indian Railways as goods train will start moving on the corridor. The Dedicated Freight Corridor Corporation of India Limited (DFCCIL) has completed 1,279km of the total 1,506km long stretch of WDFC that will connect the Jawaharlal Nehru Port Terminal (JNPT), Mumbai to Dadri. [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":45676,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3,3418],"tags":[2579,1798],"class_list":["post-66620","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-rail-news","tag-dedicated-freight-corridor","tag-freight-train"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/66620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=66620"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/66620\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/45676"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=66620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=66620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=66620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}