{"id":66797,"date":"2023-10-31T08:46:11","date_gmt":"2023-10-31T03:16:11","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=66797"},"modified":"2023-10-31T08:46:12","modified_gmt":"2023-10-31T03:16:12","slug":"trial-run-between-bangladeshs-gangasagar-and-tripuras-nishchintapur-railway-link-successful","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/trial-run-between-bangladeshs-gangasagar-and-tripuras-nishchintapur-railway-link-successful\/","title":{"rendered":"Trial run between Bangladesh\u2019s Gangasagar and Tripura\u2019s Nishchintapur railway link successful"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Ending the prolonged wait, the trial run between Bangladesh\u2019s Gangasagar and Tripura\u2019s Nishchintapur railway link was successfully conducted. However, the trials were conducted with a freight engine through the metre gauge portion. Officials have said that for passenger movement some important observation and technical interventions are required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Agartala-Akhaura railway link, connecting the eastern regions of Bangladesh with the northeastern part of India via rail, represents a significant breakthrough for Tripura, which is set to get immensely benefited in the field of trade and commerce due to the ambitious project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;The goods train successfully covered a distance of over 8.1 kilometres, arriving in Nishchintapur from Gangasagar. A six-member team was on board, managing the train&#8217;s journey. The metre gauge section has been opened to facilitate the movement of goods,&#8221; Anindra Chowdhury, the Executive Engineer overseeing the project, told media persons.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Regarding passenger transportation, Chowdhury said, &#8220;The completion of the remaining work, including resolving technical issues related to Broad Gauge connectivity and other tasks, may take a month or two. The inauguration of the metre gauge section for goods transportation is going to happen soon.&#8221; <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Abdur Rahim, the skilled locomotive pilot responsible for guiding the train to Nishchintapur, was happy to be a part of the historic moment. Expressing his feelings before the media, he said, &#8220;This railway link marks the first-ever connection between the eastern region of Bangladesh and India. I am immensely proud to have been a part of this historic moment.&#8221; Rahim was optimistic about the future of this railway connectivity, hoping that this railway connection would significantly boost tourism, trade, and medical-related travel between the two regions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ending the prolonged wait, the trial run between Bangladesh\u2019s Gangasagar and Tripura\u2019s Nishchintapur railway link was successfully conducted. However, the trials were conducted with a freight engine through the metre gauge portion. Officials have said that for passenger movement some important observation and technical interventions are required. The Agartala-Akhaura railway link, connecting the eastern regions [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":66798,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[1798,10860,1775,897],"class_list":["post-66797","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-freight-train","tag-northeast","tag-rail-freight","tag-tripura"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/66797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=66797"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/66797\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/66798"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=66797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=66797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=66797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}