{"id":68380,"date":"2023-12-16T08:46:18","date_gmt":"2023-12-16T03:16:18","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=68380"},"modified":"2023-12-16T08:46:19","modified_gmt":"2023-12-16T03:16:19","slug":"action-plan-formulated-for-development-of-26-most-viable-national-waterways","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/action-plan-formulated-for-development-of-26-most-viable-national-waterways\/","title":{"rendered":"Action plan formulated for development of 26 most viable National Waterways"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Dharma-Paradip via Mangalagadi to Pankapal route, in Odisha has a length of 233Km.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The steps taken by Government for development of Inland Waterways for cargo shipments in Odisha as well as promotion of water-based transport system are:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Thalweg survey for monitoring of Waterways on monthly basis is being conducted by Inland Waterways Authority of India (IWAI) (from Pankapal \u2013 Dhamra via Mangalgadi up to Paradip- 212 Line KM for phase-I) for identification of Least Available Depth in the navigation channel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Detailed Project Report for construction of Weirs \/ Barrages and modification of bridges was undertaken by IWAI for development of NW-5 and NW-64.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work for raising of High-tension line was entrusted to Govt. of Odisha for providing safe navigation clearance for passage of IWT vessels. IWAI is also engaged in development and operationalization of NW-5 and NW-64 on public private partnership mode. The option of forming a Special Purpose Vehicle for movement of coal is also being explored. Gypsum movement from IFFCO plant to Paradip Port Authority commenced w.e.f. 26<sup>th<\/sup> April, 2022 by IWT mode through NW-5 and NW-64. So far, a total of 8,06,053 MT of Gypsum and19,99,362 MT of other commodities have been moved through NW-5, NW-64 and NW-23 in Odisha.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Dharma-Paradip via Mangalagadi to Pankapal route, in Odisha has a length of 233Km. The steps taken by Government for development of Inland Waterways for cargo shipments in Odisha as well as promotion of water-based transport system are: Thalweg survey for monitoring of Waterways on monthly basis is being conducted by Inland Waterways Authority of [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":64744,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[11504,39,38,550],"class_list":["post-68380","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-dhamra","tag-iwai","tag-national-waterways","tag-paradip"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/68380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=68380"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/68380\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/64744"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=68380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=68380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=68380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}