{"id":69617,"date":"2024-01-30T08:37:37","date_gmt":"2024-01-30T03:07:37","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=69617"},"modified":"2024-01-30T08:37:39","modified_gmt":"2024-01-30T03:07:39","slug":"jalna-nanded-expressway-connects-to-jnpa","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/jalna-nanded-expressway-connects-to-jnpa\/","title":{"rendered":"Jalna-Nanded Expressway connects to JNPA"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Bids have been called for works in six packages for the construction of Jalna-Nanded expressway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A total of 18 players, including industry leaders like L&amp;T, G R Infraprojects, Afcons Infra, IRB infrastructure and Navayuga Engineering have been pre-qualified to undertake the construction of this expressway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">All the six packages, namely, JNE-1 to JNE-6, comes with a 900-day construction deadline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Earlier in April 2023, the Maharashtra State Road Development Corporation (MSRDC) had invited request for qualifications (RFQ) to select eligible contractors for the construction of the 179.85 km Jalna-Nanded expressway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It may be recalled that Maharashtra government has proposed to develop additional connectors or access controlled expressways to link major districts in the state to Mumbai-Nagpur Samruddhi Mahamarg.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Jalna-Nanded greenfield expressway is one such connector which will provide a direct and the fastest connectivity for Nanded, Hingoli, Parbhani and Jalna districts to the state capital Mumbai and further to the Jawaharlal Nehru Port Authority (JNPA) as well.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The expressway starts at Jalna on the Mumbai-Nagpur Samruddhi Mahamarg and traverses southwest through Jalna, Parbhani and Nanded district and ends on the Nanded-Deglur-Telangana NH 161.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The six-lane expressway will have a design speed of 120 kmph with a 100-metre right-of-way.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A unique feature of the expressway will be the provision of a 20-metre space for the construction of a high-speed rail corridor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bids have been called for works in six packages for the construction of Jalna-Nanded expressway. A total of 18 players, including industry leaders like L&amp;T, G R Infraprojects, Afcons Infra, IRB infrastructure and Navayuga Engineering have been pre-qualified to undertake the construction of this expressway. All the six packages, namely, JNE-1 to JNE-6, comes with [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":36197,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3386,3,3383,3420],"tags":[10354,7554,629,6547,8960],"class_list":["post-69617","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-logistics-news","category-news","category-ports-news","category-trucking","tag-high-speed-rail-2","tag-jawaharlal-nehru-port-authority-jnpa","tag-mumbai","tag-nagpur","tag-samruddhi-mahamarg"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/69617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=69617"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/69617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/36197"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=69617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=69617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=69617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}