{"id":69874,"date":"2024-02-07T09:00:19","date_gmt":"2024-02-07T03:30:19","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=69874"},"modified":"2024-02-07T09:00:20","modified_gmt":"2024-02-07T03:30:20","slug":"gadkari-approves-rs-1640-cr-package-for-frontier-highway-in-arunachal","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/gadkari-approves-rs-1640-cr-package-for-frontier-highway-in-arunachal\/","title":{"rendered":"Gadkari approves Rs 1,640 cr package for Frontier Highway in Arunachal"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Source: IANS<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of this package, the minister has approved Rs 1014.59 crore for the construction of the Kharsang-Miao-Vijaynagar-Gandhigram section of NH-913.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a social media post, Gadkari said that this transformative 61.55 km road, developed on EPC (engineering, procurement and construction) mode, promises enhanced connectivity to the border areas, fostering socio-economic development.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He said that crucially, the Frontier Highway aims to curb migration by encouraging reverse migration towards Arunachal Pradesh&#8217;s border regions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The minister said the project facilitates the essential road infrastructure needed for connecting significant river basins, catalysing the development of numerous hydropower projects and promoting tourism in the pristine, sparsely-populated upper Arunachal region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gadkari has also sanctioned Rs 626.92 crore for the construction of Package-1, encompassing the Sarli-Huri section of NH-913.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The minister said this 35 km project, executed on EPC mode in Kurung Kumey district, aims to ensure seamless and secure traffic flow. Significantly, it establishes year-round connectivity for villages in the region, catalysing socio-economic development in the hilly areas of the district, he added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Source: IANS As part of this package, the minister has approved Rs 1014.59 crore for the construction of the Kharsang-Miao-Vijaynagar-Gandhigram section of NH-913. In a social media post, Gadkari said that this transformative 61.55 km road, developed on EPC (engineering, procurement and construction) mode, promises enhanced connectivity to the border areas, fostering socio-economic development. He [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":39920,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3393,3386,3],"tags":[8622,5869],"class_list":["post-69874","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-exim-news","category-logistics-news","category-news","tag-arunachal-pradesh","tag-highway-construction"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/69874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=69874"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/69874\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/39920"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=69874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=69874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=69874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}