{"id":70110,"date":"2024-02-19T08:44:52","date_gmt":"2024-02-19T03:14:52","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=70110"},"modified":"2024-02-19T08:44:53","modified_gmt":"2024-02-19T03:14:53","slug":"centre-plans-to-take-up-northern-ring-rd-under-vision-2047-plan-in-jaipur","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/centre-plans-to-take-up-northern-ring-rd-under-vision-2047-plan-in-jaipur\/","title":{"rendered":"Centre plans to take up northern Ring Rd under Vision 2047 plan in Jaipur"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">\u201cThere are several doubts on the execution of Bharatamala II projects. And with MoRTH minister Nitin Gadkari taking special interest in the Ring Road corridor project for Jaipur, NHAI and MoRTH are trying out ways to include it in some other programme of the Union government to execute it as fast as possible. In all probability, it may be included in the Vision 2047 programme of the Union government,\u201d said a senior NHAI official.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Northern Ring Road project is divided into two parts, under which NHAI has to connect two arms of the Ring Road. One arm would be connected from Mahapura area of Ajmer Road, from where the already existing Southern Ring Road starts, and will end at Chandwaji village on Delhi Road. The second arm will connect Chandwaji village to Bagrana village on Agra Road, where the present Southern Ring Road ends.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cOnce the Northern Ring Road is completed, the entire corridor will take shape of a ring surrounding the outskirts of the main city. Four important highways on all four sides of the city, the Ajmer Road, the Tonk Road, the Agra Road and the Delhi Road, will be connected with this ring road,\u201d an NHAI official explained.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Officials said that the first arm of the Northern Ring Road \u2013 the 52-km stretch between Mahapura and Chandwaji \u2013 is the need of the hour. Once this stretch is completed, vehicles will no longer have to travel to the congested 200-Feet Bypass and can reach Delhi Road directly through this corridor from Mahapura itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe second arm \u2013 a 44-km stretch between Chandwaji and Bagrana \u2013 won\u2019t be that popular. NHAI is constructing a link road for the Delhi Vadodara Expressway between Bagrana and Bandikui exit of the expressway. We don\u2019t feel that Delhi-bound vehicles from Agra Road will travel on the opposite direction through the second arm of the Northern Ring Road. These vehicles would prefer to take the link road and then the expressway at Bandikui to reach Delhi,\u201d another NHAI official opined.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201cThere are several doubts on the execution of Bharatamala II projects. And with MoRTH minister Nitin Gadkari taking special interest in the Ring Road corridor project for Jaipur, NHAI and MoRTH are trying out ways to include it in some other programme of the Union government to execute it as fast as possible. In all [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":43080,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3386,3,3413,3387,3420],"tags":[6009,11890,1934,5869,225,9166],"class_list":["post-70110","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-logistics-news","category-news","category-supply-chain-news","category-transport-news","category-trucking","tag-bharatmala-pariyojana","tag-delhi-vadodara-expressway","tag-highway-connectivity","tag-highway-construction","tag-nhai","tag-regional-ring-road"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/70110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=70110"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/70110\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/43080"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=70110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=70110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=70110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}