{"id":70979,"date":"2024-04-08T09:47:09","date_gmt":"2024-04-08T04:17:09","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=70979"},"modified":"2024-04-08T09:47:10","modified_gmt":"2024-04-08T04:17:10","slug":"hindustan-shipyard-ltd-posts-highest-ever-pre-tax-revenue-of-rs-1597-crore","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/hindustan-shipyard-ltd-posts-highest-ever-pre-tax-revenue-of-rs-1597-crore\/","title":{"rendered":"Hindustan Shipyard Ltd posts highest-ever pre-tax revenue of Rs 1597 crore"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Source: Times News Network<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2021, the total revenue was Rs 478 crore and company posted a loss of Rs 14 crore. HSL has thus demonstrated an irreversible turnaround from a loss-making company to a vibrant DPSU contributing to \u2018Atmanirbhar Bharat\u2019 in National Shipbuilding.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HSL has in the past 3 years taken steps that have strengthened defence PSU\u2019s overall performance which includes infrastructure upgradation, improving corporate governance, and increased focus on ship repairs and refit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HSL towards boosting its capacity for ongoing Fleet Support Ships and future projects like Landing Platform Dock signed a major infrastructure upgradation contract with L&amp;T Geostructure on March 30 with a project completion timeline of 20 months.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In order to augment the capacity of the shipyard, HSL has stressed significantly the PPP Projects, which is another important reason behind the record revenue generation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Source: Times News Network In 2021, the total revenue was Rs 478 crore and company posted a loss of Rs 14 crore. HSL has thus demonstrated an irreversible turnaround from a loss-making company to a vibrant DPSU contributing to \u2018Atmanirbhar Bharat\u2019 in National Shipbuilding. HSL has in the past 3 years taken steps that have [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":64788,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3401,3,3384],"tags":[10739,12261,2707,1737],"class_list":["post-70979","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-main-line-operators","category-news","category-shipping-news","tag-hindustan-shipyard-limited","tag-lt-geostructure","tag-ship-building","tag-ship-repair"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/70979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=70979"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/70979\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/64788"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=70979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=70979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=70979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}