{"id":72027,"date":"2024-06-12T09:26:56","date_gmt":"2024-06-12T03:56:56","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=72027"},"modified":"2024-06-12T09:27:00","modified_gmt":"2024-06-12T03:57:00","slug":"j-m-baxi-heavy-sets-new-standards-successfully-delivers-heaviest-modules-for-lt-marjan-offshore-field","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/j-m-baxi-heavy-sets-new-standards-successfully-delivers-heaviest-modules-for-lt-marjan-offshore-field\/","title":{"rendered":"J M BAXI HEAVY Sets New Standards: Successfully Delivers Heaviest Modules for L&amp;T Marjan Offshore Field"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Here at J M BAXI HEAVY, we&#8217;re thrilled to share a monumental achievement in India&#8217;s engineering sphere \u2013 the successful delivery of three of the heaviest modules for the L&amp;T Marjan offshore field project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Details of the Project:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despite the hurdles posed by the Covid-19 lockdown in March 2020, our determined engineering team stood strong, ensuring the seamless fabrication of these enormous modules. Dubbed TP-11, TP-12, and TP-13, these structures stand as shining examples of Indian engineering excellence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Timelines and Execution:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our journey began in November 2023, once we had navigated through the challenges brought on by the pandemic. With careful planning, we conducted loadouts every 60 days, a testament to our strategic project management approach. Through innovative loadout arrangements and the implementation of a float-over operation, we ensured the safe and efficient transportation of these massive structures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Setting New Records:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">J M BAXI HEAVY Successfully Delivers Three Heaviest Modules for L&amp;T Marjan Offshore Field. The pinnacle of our achievement was reached on May 30, 2024, as we completed the final loadout of TP-12. Let&#8217;s delve into the specifics:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Name<\/td><td>Dimensions (LxWxH) mm<\/td><td>WT. (MT)<\/td><td>Qty<\/td><td>Load out dates<\/td><td>Loadout Wt. (MT)<\/td><\/tr><tr><td>TP -11 TOPSIDE<\/td><td>73.67&#215;49.50&#215;47.91<\/td><td>5663<\/td><td>1<\/td><td>03\/12\/2023<\/td><td>6857<\/td><\/tr><tr><td>TP -13 TOPSIDE<\/td><td>73.67&#215;49.50&#215;47.91<\/td><td>6314<\/td><td>1<\/td><td>08\/03\/2024<\/td><td>7557<\/td><\/tr><tr><td>TP -12 TOPSIDE<\/td><td>73.67&#215;49.50&#215;47.91<\/td><td>5554<\/td><td>1<\/td><td>30\/05\/2024<\/td><td>6786<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These monumental modules, complete with load spreaders and axles, were transported and loaded out using state-of-the-art equipment, including 260 SPMT axle lines with 12 PPU and 85 ballast pumps.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Each loadout, from axle insertion to final placement onto the HDB-402, a 400-class float-over barge, was efficiently executed within a mere 36 hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With a combined weight of 18,000 metric tons and comprising 530,000 freight units, these modules signify a paradigm shift in engineering and logistics capabilities. We extend our heartfelt gratitude to L&amp;T Hydrocarbon for entrusting us with this monumental project. Rest assured, it remains our steadfast commitment to uphold schedules and prioritize safety in all our endeavours.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Here at J M BAXI HEAVY, we&#8217;re thrilled to share a monumental achievement in India&#8217;s engineering sphere \u2013 the successful delivery of three of the heaviest modules for the L&amp;T Marjan offshore field project. Details of the Project: Despite the hurdles posed by the Covid-19 lockdown in March 2020, our determined engineering team stood strong, [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":72028,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3,3411],"tags":[3192,9391,12616],"class_list":["post-72027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-news","category-project-cargo","tag-jm-baxi-group","tag-jm-baxi-heavy","tag-lt-marjan-offshore-field"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/72027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=72027"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/72027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/72028"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=72027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=72027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=72027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}