{"id":74713,"date":"2024-10-18T09:19:19","date_gmt":"2024-10-18T03:49:19","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=74713"},"modified":"2024-10-18T09:19:27","modified_gmt":"2024-10-18T03:49:27","slug":"visakhapatnam-port-signs-mou-with-hindustan-shipyard","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/visakhapatnam-port-signs-mou-with-hindustan-shipyard\/","title":{"rendered":"Visakhapatnam Port signs MOU with Hindustan Shipyard"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Hindustan\u00a0Shipyard\u00a0Limited\u00a0(HSL)\u00a0and\u00a0Visakhapatnam\u00a0Port\u00a0Authority\u00a0(VPA)\u00a0have\u00a0inked\u00a0a\u00a0contract\u00a0for\u00a0the\u00a0design\u00a0and\u00a0construction\u00a0of\u00a0a\u00a060-ton\u00a0Bollard\u00a0Pull\u00a0Tug. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The tug will be finished in 18 months and is intended to enhance ship movements in the harbor. This cutting-edge vessel is anticipated to increase cargo flow and improve operating efficiency at Visakhapatnam Port thanks to its sophisticated safety measures.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hindustan\u00a0Shipyard\u00a0Limited\u00a0(HSL)\u00a0and\u00a0Visakhapatnam\u00a0Port\u00a0Authority\u00a0(VPA)\u00a0have\u00a0inked\u00a0a\u00a0contract\u00a0for\u00a0the\u00a0design\u00a0and\u00a0construction\u00a0of\u00a0a\u00a060-ton\u00a0Bollard\u00a0Pull\u00a0Tug. The tug will be finished in 18 months and is intended to enhance ship movements in the harbor. This cutting-edge vessel is anticipated to increase cargo flow and improve operating efficiency at Visakhapatnam Port thanks to its sophisticated safety measures.<\/p>\n","protected":false},"author":22,"featured_media":74714,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3,3383,3384],"tags":[13357,10983,7584],"class_list":["post-74713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-news","category-ports-news","category-shipping-news","tag-bollard-pull-tug","tag-hindustan-shipyard","tag-visakhapatnam-port-authority"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/74713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=74713"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/74713\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/74714"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=74713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=74713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=74713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}