{"id":78792,"date":"2025-03-19T07:51:53","date_gmt":"2025-03-19T02:21:53","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=78792"},"modified":"2025-03-19T07:51:53","modified_gmt":"2025-03-19T02:21:53","slug":"sonowal-flags-off-lt-made-electrolysers-for-kandla-port","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/sonowal-flags-off-lt-made-electrolysers-for-kandla-port\/","title":{"rendered":"Sonowal flags off L&#038;T-made electrolysers for Kandla port"},"content":{"rendered":"<p><strong>I<\/strong>n a step towards energy transition and achieving the objectives of the National Green Hydrogen Mission, Union Minister Sarbananda Sonowal on Tuesday virtually flagged off the Electrolysers manufactured by L&amp;T under &#8220;Make-in-India&#8221; for a 1 MW Green Hydrogen Plant being set up at Deendayal Port Authority, Kandla.<\/p>\n<p>In line with the decision to develop Kandla Port as a Green Hydrogen Hub, DPA Kandla initiated action in December 2024 for setting up an operated 1 MW Green Hydrogen Plant (to be subsequently scaled up to 10 MW capacity), marking a pioneering effort towards sustainable energy adoption in India&#8217;s maritime sector.<\/p>\n<p>The primary objective of this plant is to provide engineers and technicians with crucial exposure to the production, storage and handling ecosystem of Green Hydrogen.<\/p>\n<p>Recognizing L&amp;T as a proven leader in the Green Hydrogen space, having already established a 1 MW Green Hydrogen Plant at Hazira (inaugurated by the Prime Minister over a year ago, DPA entrusted the manufacturing of these\u00a0electrolysers\u00a0to L&amp;T.<\/p>\n<p>L&amp;T successfully manufactured these 1 MW\u00a0electrolysers\u00a0in a record time of just three months. Electrolysers are the most crucial component of any Green Hydrogen plant, playing a pivotal role in hydrogen generation.With the site work already completed at Kandla, these\u00a0electrolysers\u00a0will soon be assembled on-site to kickstart operations.<\/p>\n<p>The Green Hydrogen Plant is targeted to be fully operational by July 2025. Its estimated production capacity is 18 kg of Green Hydrogen per hour, translating to approximately 80-90 tonnes per year.<\/p>\n<p>This will make DPA Kandla the first port in the country to have set up an operational Green Hydrogen plant within the port limits, using indigenous Electrolysers.<\/p>\n<p>The facility&#8217;s Green Hydrogen will be utilized to generate clean energy through Fuel Cells, paving the way for self-sustaining and eco-friendly power solutions at the port.<\/p>\n<p>Additionally, DPA has ambitious plans to integrate Green Ammonia production by incorporating the necessary modules into the plant.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a step towards energy transition and achieving the objectives of the National Green Hydrogen Mission, Union Minister Sarbananda Sonowal on Tuesday virtually flagged off the Electrolysers manufactured by L&amp;T under &#8220;Make-in-India&#8221; for a 1 MW Green Hydrogen Plant being set up at Deendayal Port Authority, Kandla. In line with the decision to develop Kandla [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":78793,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3,3383,3384],"tags":[13451,11309,13,5524],"class_list":["post-78792","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-news","category-ports-news","category-shipping-news","tag-dpa","tag-hydrogen","tag-kandla-port","tag-sarbananda-sonowal"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/78792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=78792"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/78792\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/78793"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=78792"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=78792"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=78792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}