{"id":78944,"date":"2025-03-27T08:05:26","date_gmt":"2025-03-27T02:35:26","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=78944"},"modified":"2025-03-27T08:05:26","modified_gmt":"2025-03-27T02:35:26","slug":"rites-emerges-as-sole-bidder-for-kochi-metro-dpr","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/rites-emerges-as-sole-bidder-for-kochi-metro-dpr\/","title":{"rendered":"RITES emerges as sole bidder for Kochi Metro DPR"},"content":{"rendered":"<p>RITES, under the Ministry of Railways, is the only qualified bidder for preparing the detailed project report (DPR) for Kochi Metro\u2019s proposed Phase-III airport line.<br \/>\nThe DPR will determine the corridor\u2019s length, alignment, stations, and feasibility as an independent line from Aluva to Angamaly, rather than an extension of the existing Tripunithura-Aluva line. The consultant will assess the use of different rolling stock and potential future extension to Kochi GIFT City in the Kochi Bengaluru Industrial Corridor.<\/p>\n<p>As per KMRL\u2019s preliminary plan, the 18 km metro line will have 15 stations, running along NH-544, through Kariyad-Airport-Mattoor Road to Nedumbassery International Airport, and onward to MC Road in Angamaly. A three km underground section and station are planned at the airport.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RITES, under the Ministry of Railways, is the only qualified bidder for preparing the detailed project report (DPR) for Kochi Metro\u2019s proposed Phase-III airport line. The DPR will determine the corridor\u2019s length, alignment, stations, and feasibility as an independent line from Aluva to Angamaly, rather than an extension of the existing Tripunithura-Aluva line. The consultant [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":78945,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3,3418,3387],"tags":[14463,13383,13291],"class_list":["post-78944","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-news","category-rail-news","category-transport-news","tag-kochi-metro","tag-project","tag-rites"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/78944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=78944"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/78944\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/78945"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=78944"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=78944"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=78944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}