{"id":79142,"date":"2025-04-04T07:39:03","date_gmt":"2025-04-04T02:09:03","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=79142"},"modified":"2025-04-04T07:39:05","modified_gmt":"2025-04-04T02:09:05","slug":"pfc-approves-a-loan-of-%e2%82%b93517-crore-for-chhattisgarh-east-rail-corridor-project","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/pfc-approves-a-loan-of-%e2%82%b93517-crore-for-chhattisgarh-east-rail-corridor-project\/","title":{"rendered":"PFC approves a loan of \u20b93,517 crore for Chhattisgarh East Rail Corridor project"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">PFC has sanctioned Rs 3,517 crore worth of loan to Chhattisgarh East Railway Limited (CERL) for implementing the East Rail Corridor Project in Chhattisgarh. CERL is a joint venture of South Eastern Coalfields Limited (SECL), IRCON, and Chhattisgarh State Industrial Development Corporation Limited (CSIDCL), PFC said in a statement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The loan documents for a term loan amounting to Rs 3,516.68 crore were executed on March 28, 2025, PFC said. The under-construction railway project is being developed primarily for transporting coal from multiple coal mines in the vicinity and connecting them to thermal power plants.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under Ministry of Power, PFC is a nodal agency for development of Integrated Power Development Scheme, Ultra Mega Power Projects and Bid Process Coordinator for Independent Transmission Projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PFC has sanctioned Rs 3,517 crore worth of loan to Chhattisgarh East Railway Limited (CERL) for implementing the East Rail Corridor Project in Chhattisgarh. CERL is a joint venture of South Eastern Coalfields Limited (SECL), IRCON, and Chhattisgarh State Industrial Development Corporation Limited (CSIDCL), PFC said in a statement. The loan documents for a term [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":79143,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3,3418,3387],"tags":[14495,8456,14493],"class_list":["post-79142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-news","category-rail-news","category-transport-news","tag-pfc","tag-rail-corridor","tag-rail-project"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/79142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=79142"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/79142\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/79143"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=79142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=79142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=79142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}