{"id":81894,"date":"2025-06-25T08:33:02","date_gmt":"2025-06-25T03:03:02","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=81894"},"modified":"2025-06-25T08:33:03","modified_gmt":"2025-06-25T03:03:03","slug":"avp-infracon-bags-contract-from-reliance-mappedu-logistics-park","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/avp-infracon-bags-contract-from-reliance-mappedu-logistics-park\/","title":{"rendered":"AVP Infracon bags contract from Reliance Mappedu Logistics Park"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">AVP Infracon Limited has received a Letter of Acceptance (LoA) from Reliance Mappedu Multi Modal Logistics Park Limited. The contract is valued at approximately \u20b933.34 crore. The order relates to infrastructure development work for the South Parcel (Outside Battery Limits \u2013 OSBL) of the logistics park. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under BOQ 3 of the project plan, the scope includes civil and utility infrastructure works intended to support the logistics operations planned in the specified area. The work is scheduled for completion within five months. The contract is part of AVP Infracon\u2019s ongoing engagement with logistics and industrial infrastructure projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AVP Infracon Limited has received a Letter of Acceptance (LoA) from Reliance Mappedu Multi Modal Logistics Park Limited. The contract is valued at approximately \u20b933.34 crore. The order relates to infrastructure development work for the South Parcel (Outside Battery Limits \u2013 OSBL) of the logistics park. Under BOQ 3 of the project plan, the scope [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":81895,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3386,3417,3],"tags":[15142,15143,6266],"class_list":["post-81894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-logistics-news","category-logistics-parks-news","category-news","tag-avp-infracon","tag-mappedu-logistics-park","tag-reliance"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/81894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=81894"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/81894\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/81895"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=81894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=81894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=81894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}