{"id":8471,"date":"2017-04-18T12:32:58","date_gmt":"2017-04-18T07:02:58","guid":{"rendered":"http:\/\/www.maritimegateway.com\/?p=8471"},"modified":"2017-04-18T12:32:58","modified_gmt":"2017-04-18T07:02:58","slug":"cochin-port-records-13-2-cargo-growth","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/cochin-port-records-13-2-cargo-growth\/","title":{"rendered":"Cochin Port records 13.2% cargo growth"},"content":{"rendered":"<p>During 2015-16 the Port handled a Total traffic of 22.10 MMT. Traffic during 2016-17 is 25.01 MMT with the growth of 13.2%.<br \/>\nThe Total no. of Containers handled during 2015-16 is 4.20 lakhs Teu\u2019s and during 2016-17 is 4.91 lakhs TEUs with the growth of 17.0%.<br \/>\nContainers for the month of March, 2017 at 45,346 TEUs is an all time record at ICTT.<br \/>\nTotal POL handled during 2015-16 is 13.77 MMT and during 2016-17 is 15.79 MMT.<br \/>\nCoastal Car carriers have started calling at Cochin Port from September 2016 onwards<\/p>\n<p>The Port has offered 80% rebates in Port charges towards attracting the business. This arrangement ultimately benefits the end user a minimum of Rs.3000\/-.<br \/>\nThe total No. of Cruise vessels that called at the Port during 2015-16 is 33 and during 2016-17 is 46.<br \/>\nThe Port could attract Wheat Vessels during the current year and handled 1.74 lakhs Tonnes during 2016-2017.<\/p>\n<p>Ongoing Projects:-<br \/>\n1) Construction of Subway &amp; ROB:- Port has taken up conversion of 2nd GIDA bridge as and ROB and construction of a fly over in front of exit gate of ICTT to decongest the area at a cost of Rs.60 cr. The work will be completed by June, 2017.<br \/>\n2) Refurbishment of Coastal Liquid berth:- Port has completed refurbishment of Cochin Oil Terminal. Refurbishment of North Tanker berth would be taken up during September, 2017. Estimated cost of the project is Rs.19.95cr.<br \/>\n3) Installation of rooftop Solar Panels:- work has been awarded for instillation of Roof top solar panels at a capacity of 0.15MW.<br \/>\n4) Combating Pollution:- work order has been issued for procurement of oil Spill Response Equipments at a total cost of Rs.3.96cr.<br \/>\n5) Multi User liquid Terminal is being developed jointly with IOC with a capacity of 4.10MMTPA at Puthuvypeen. Estimated cost of the project is Rs.240cr.<br \/>\n6) Barge Jetty for handling of Bunkers is being taken up at a cost of Rs.34.57cr.[\/vc_column_text]<\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":8106,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3],"tags":[],"class_list":["post-8471","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/8471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=8471"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/8471\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/8106"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=8471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=8471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=8471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}