{"id":91385,"date":"2026-01-09T09:20:28","date_gmt":"2026-01-09T03:50:28","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=91385"},"modified":"2026-01-09T09:20:32","modified_gmt":"2026-01-09T03:50:32","slug":"horizon-industrial-parks-strengthens-partnership-with-benteler-automotive-through-manufacturing-facility","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/horizon-industrial-parks-strengthens-partnership-with-benteler-automotive-through-manufacturing-facility\/","title":{"rendered":"Horizon Industrial Parks strengthens partnership with BENTELER Automotive through manufacturing facility"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Horizon Industrial Parks announced the expansion of its collaboration with BENTELER Automotive India, with the global automotive components manufacturer leasing a new ~1.36 lakh sq. ft. manufacturing facility at Horizon Industrial Park Chakan II. This addition builds upon BENTELER\u2019s existing ~1.28 lakh sq. ft. facility, operational since October 2021, further solidifying Horizon\u2019s position as a trusted infrastructure partner for advanced manufacturing companies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The newly leased facility will support BENTELER\u2019s in-house production of tubes for torsion beams, a capability previously dependent entirely on imports. These tubes will then undergo further processing at BENTELER\u2019s current plant within the park to manufacture rear axle beams. The new operations will enhance localisation, reduce import reliance, and improve supply-chain agility for BENTELER.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A Testament to Horizon\u2019s Quality, Agility and Customer-Centricity<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BENTELER\u2019s decision to expand within Horizon Industrial Park Chakan II reflects the strong relationship built over years of consistent delivery, robust infrastructure, and responsive support. Horizon has previously delivered BENTELER\u2019s built-to-suit facility with high-performance features including energy-efficient materials, insulated roofing and walls, overhead crane readiness, and provisions for solar power, creating a resilient and scalable base for automotive component manufacturing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Urvish Rambhia, CEO, Horizon Industrial Parks said, \u201cHorizon Industrial Park, Chakan II, an IGBC Platinum Certified asset, is strategically located in Chakan\u2019s MIDC Phase 2 with future-ready infrastructure. The strategic location of the park within a major automobile and manufacturing hub, along with its with efficient layouts, renewable energy integration and high safety standards, make it an excellent base for businesses expanding in this region\u201d.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BENTELER Automotive India has acknowledged Horizon\u2019s commitment to delivering future-ready, sustainable industrial ecosystems supported by high-quality project execution. For the new facility, Horizon has supported BENTELER with tenant-specific infrastructure improvements, including customised loading\/unloading docks to ease inventory movement and logistics. This collaborative approach underlines the strength of the partnership.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cHorizon Industrial Park Chakan II has provided an environment that aligns with our values of safety, sustainability and operational excellence. The team\u2019s proactive approach and timely responsiveness have played a major role in our decision to expand within the park. We value this partnership and look forward to continued collaboration with Horizon.\u201d said Mukund Gangane, MD, BENTELER Automotive India.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Horizon Industrial Parks announced the expansion of its collaboration with BENTELER Automotive India, with the global automotive components manufacturer leasing a new ~1.36 lakh sq. ft. manufacturing facility at Horizon Industrial Park Chakan II. This addition builds upon BENTELER\u2019s existing ~1.28 lakh sq. ft. facility, operational since October 2021, further solidifying Horizon\u2019s position as a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":91386,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3388,3386,3417,3,3413],"tags":[17213,7526,4320],"class_list":["post-91385","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-global-news","category-logistics-news","category-logistics-parks-news","category-news","category-supply-chain-news","tag-benteler","tag-horizon-industrial-parks","tag-logistics-news"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/91385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=91385"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/91385\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/91386"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=91385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=91385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=91385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}