{"id":91438,"date":"2026-01-12T07:01:56","date_gmt":"2026-01-12T01:31:56","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=91438"},"modified":"2026-01-12T15:03:46","modified_gmt":"2026-01-12T09:33:46","slug":"nhai-guinness-world-records-nh-544g","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/nhai-guinness-world-records-nh-544g\/","title":{"rendered":"NHAI achieves four Guinness World records on Bengaluru\u2013Kadapa\u2013Vijayawada Economic Corridor"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The National Highways Authority of India (NHAI) has entered the Guinness World Records by accomplishing four record-breaking milestones on the under-construction Bengaluru\u2013Kadapa\u2013Vijayawada Economic Corridor (NH-544G), marking a major achievement in highway construction and project execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to NHAI, the first two records were set on January 6 near Puttaparthi in Andhra Pradesh. One record was established for the longest continuous laying of bituminous concrete, covering 28.89 lane-kilometers\u2014equivalent to a three-lane-wide stretch of 9.63 km \u2014 completed within a span of 24 hours. The second record recognised the continuous laying of the highest quantity of bituminous concrete in a single day, totalling 10,655 metric tonnes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NHAI said these achievements were the first of their kind globally on a six-lane national highway project along the Bengaluru\u2013Kadapa\u2013Vijayawada Economic Corridor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Building on this performance, two more <a href=\"https:\/\/maritimegateway.com\/staging\/staging\/category\/news\/\">Guinness World Records were created on January 11. These included the continuous paving of 57,500 metric tonnes of bituminous concrete in 24 hours<\/a>, as well as the longest continuous paving operation covering 156 lane-kilometers\u2014a three-lane-wide stretch of 52 km. This surpassed the earlier world record of 84.4 lane-kilometres, which involved a two-lane-wide section of 42.2 km.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The record-setting works were carried out across Package-2 and Package-3 of the economic corridor, highlighting the scale and efficiency of construction operations on the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 343-km-long, access-controlled Bengaluru\u2013Kadapa\u2013Vijayawada Economic Corridor is being developed as a six-lane highway designed for safe, high-speed and seamless travel. The corridor will feature 17 interchanges, 10 wayside amenities and a 5.3-km-long tunnel, with nearly 21 km of the alignment passing through forest terrain, combining infrastructure development with environmental sensitivity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The National Highways Authority of India (NHAI) has entered the Guinness World Records by accomplishing four record-breaking milestones on the under-construction Bengaluru\u2013Kadapa\u2013Vijayawada Economic Corridor (NH-544G), marking a major achievement in highway construction and project execution. According to NHAI, the first two records were set on January 6 near Puttaparthi in Andhra Pradesh. One record was [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":91439,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3425,3388,3386,3,3413,3387,3420],"tags":[6561,4320,5619,225],"class_list":["post-91438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asia-shipping-news","category-global-news","category-logistics-news","category-news","category-supply-chain-news","category-transport-news","category-trucking","tag-economic-corridor","tag-logistics-news","tag-national-highway","tag-nhai"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/91438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=91438"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/91438\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/91439"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=91438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=91438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=91438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}