{"id":93698,"date":"2026-05-13T20:15:44","date_gmt":"2026-05-13T14:45:44","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=93698"},"modified":"2026-09-25T15:26:34","modified_gmt":"2026-09-25T09:56:34","slug":"genma-secures-crane-contract-for-jsw-kolkata-terminal","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/genma-secures-crane-contract-for-jsw-kolkata-terminal\/","title":{"rendered":"GENMA Secures Crane Contract for JSW Kolkata Terminal"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">GENMA has won a major equipment supply order from JSW Kolkata Container Terminal Pvt Ltd to deliver three Ship-to-Shore (STS) cranes and nine Rubber Tyred Gantry (RTG) cranes for its upcoming terminal in eastern IndiA. The contract strengthens GENMA&#8217;s footprint in India&#8217;s port equipment sector and reflects rising investment in modern container handling infrastructure nationwide.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">JSW Kolkata Container Terminal is part of JSW Infrastructure Ltd.&#8217;s expanding port network, with the company ranking as India&#8217;s second-largest private commercial port operator. JSW Infrastructure has been growing its presence on both coasts with a focus on operational efficiency, multimodal connectivity, and sustainable port development.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"delivery-challenges\">Delivery Challenges<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Crane deliveries are scheduled to commence in 2027, but the project faces unique logistical constraints due to the terminal&#8217;s inland waterway location. Access to the terminal is regulated through lock gates, requiring cranes to be shipped in multiple consignments using smaller-tonnage vessels. This necessitates extensive shipment planning, synchronised logistics coordination, and phased on-site assembly operations. Execution schedules must also account for eastern India&#8217;s monsoon conditions, with installation activities carefully planned around limited weather windows to avoid disruptions. Rajendra Patil, Regional Sales Director at GENMA, noted that the project demonstrates the company&#8217;s expertise in handling customized engineering and delivery requirements despite strict vessel size restrictions and monsoon avoidance needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project aligns with JSW Group&#8217;s sustainability objectives, with GENMA&#8217;s green crane designs and energy-efficient technologies complementing JSW Infrastructure&#8217;s focus on environmentally responsible port operations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GENMA has won a major equipment supply order from JSW Kolkata Container Terminal Pvt Ltd to deliver three Ship-to-Shore (STS) cranes and nine Rubber Tyred Gantry (RTG) cranes for its upcoming terminal in eastern IndiA. The contract strengthens GENMA&#8217;s footprint in India&#8217;s port equipment sector and reflects rising investment in modern container handling infrastructure nationwide. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":93699,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3,3383],"tags":[1663,1872],"class_list":["post-93698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-ports-news","tag-genma","tag-jsw-infrastructure"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/93698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=93698"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/93698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/93699"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=93698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=93698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=93698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}