{"id":95172,"date":"2026-07-02T10:39:13","date_gmt":"2026-07-02T05:09:13","guid":{"rendered":"https:\/\/www.maritimegateway.com\/?p=95172"},"modified":"2026-07-02T10:39:16","modified_gmt":"2026-07-02T05:09:16","slug":"kamarajar-port-sets-2027-second-terminal-plan","status":"publish","type":"post","link":"https:\/\/maritimegateway.com\/staging\/kamarajar-port-sets-2027-second-terminal-plan\/","title":{"rendered":"Kamarajar Port Sets 2027 Second Terminal Plan"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Kamarajar Port is moving ahead with a major infrastructure push, with 2027 identified as the target year for development of its second container terminal. The project is expected to boost port capacity and strengthen container-handling operations on India\u2019s east coast.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plan follows earlier interest shown by the port in inviting bids and advancing the terminal project through formal consultation and pre-application steps. Industry updates indicate the new terminal is being designed for a capacity of around 2 million TEUs, making it a significant expansion for the port\u2019s logistics ecosystem.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kamarajar Port is moving ahead with a major infrastructure push, with 2027 identified as the target year for development of its second container terminal. The project is expected to boost port capacity and strengthen container-handling operations on India\u2019s east coast. The plan follows earlier interest shown by the port in inviting bids and advancing the [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":95173,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"footnotes":""},"categories":[3,3383],"tags":[1074],"class_list":["post-95172","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-ports-news","tag-kamarajar-port"],"_links":{"self":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/95172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/comments?post=95172"}],"version-history":[{"count":0,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/posts\/95172\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media\/95173"}],"wp:attachment":[{"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/media?parent=95172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/categories?post=95172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimegateway.com\/staging\/wp-json\/wp\/v2\/tags?post=95172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}