Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

Adani and Reliance to manufacture solar gigafabs

byMaritimegateway
September 14, 2026
in News
Reading Time: 2 mins read

The government’s production-linked incentives scheme for gigawatt-scale manufacturing of high-efficiency solar modules has received bids for an overwhelming 54.8 GW of capacity with participation from existing manufacturers and new players alike. Out of the total 18 bidders, half are new to solar manufacturing.

In the shortlist, Adani Infrastructure, Jindal India Solar, Reliance New Energy, and Shirdi Sai Electricals are the highest scorers with each of them winning 100 marks—owing to the fact they offered full extent of integration up to polysilicon manufacturing stage (50 marks) and a maximum capacity of 4 GW each (another 50 marks). USA-based thin-film module First Solar is also a strong contender with 90 marks (50 marks awarded for full integration plus 40 marks for 3 GW proposed capacity).

Also on the shortlist are Coal India Limited, CubicPV, Larsen and Toubro, and ReNew Power, which submitted bids for module fabs integrated up to ingots-wafers manufacturing from outsourced polysilicon. And Avaada Energy, Acme Solar, Emmvee PV, Jupiter Solar, Megha Engineering, Premier Energies, Tata Power Solar, Vikram Solar, and Waaree Energies as bidders for cell and module manufacturing (please see the below chart released by JMK Research).

Bid Capacities and Total Marks Assigned under Solar Manufacturing PLI SchemeJMK Research

“The bidder/manufacturer getting higher marks will get preference in the allocation of manufacturing capacity under the PLI scheme. In case of equal marks, the bidder/manufacturer quoting the least total PLI amount for five years’ period, followed by a higher ‘Extent of integration’ followed by higher ‘Manufacturing Capacity,’ will get priority in the selection,” as per the PLI bid document.

The shortlisted applicants will lodge bids based on the level of PLI funding they will require for five years after their planned factories are commissioned. 

The maximum incentive to a single manufacturer will be tied to 2 GW of its annual production capacity or half of the planned output of its facility, whichever is lower. That cap will ensure at least three solar manufacturers can benefit from the INR4,500 crore pot.

Source : PV Magazine

Tags: Adani|Jindal Solar|production-linked incentives (PLI) scheme|Reliance|Solar modules

Maritimegateway

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

India ship entry rules add salvage and pollution-response checks
Customs

India ship entry rules add salvage and pollution-response checks

October 10, 2026
NCT concession keeps ownership with Bangladesh
Asia

NCT concession keeps ownership with Bangladesh, says shipping minister

October 10, 2026
Major Ports Cargo Traffic Climbs 8% in First Half of FY27
Cargo

Major Ports Cargo Traffic Climbs 8% in First Half of FY27 as Growth Gathers Pace

October 10, 2026
Trichy Dry Port Moves Ahead
Cargo

Trichy Dry Port Moves Ahead as Tamil Nadu Shortlists Sites for Multimodal Logistics Hub

October 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post

In Quad summit India secures its semiconductor supplies

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.