Monday, November 23, 2026
Maritime Gateway
No Result
View All Result
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
  • Login
Maritime Gateway
  • Logistics
    • Supply Chain
    • Warehousing
    • Logistics Parks
  • Transport
    • Rail
    • Trucking
    • Multimodal
    • Waterways
  • Global News
    • Americas
    • Asia
    • Europe
    • Middle East
    • Africa
  • Technology
  • More
    • Webinars
    • Reports
    • Newsletters
No Result
View All Result
  • Login
Maritime Gateway
No Result
View All Result

Trans-Afghan Railway Line gains momentum

byKalpana Pandey
July 29, 2022
in Asia, EXIM, Logistics, News, Rail, Supply Chain, Transport
Reading Time: 6 mins read

The Trans-Afghan railway project is gathering momentum as Uzbekistan prioritizes access to Pakistan’s seaports of Karachi, Gwadar, and Qasim, as part of Tashkent’s bid to diversify its supply routes and increase volumes of Euro-Asian trade. The geopolitical realignment and instability caused by the prolonged Russia-Ukraine conflict have overturned global calculations about supply routes, especially in Uzbekistan, meaning infrastructure projects previously thought unfeasible are now making progress. One possible beneficiary is the Trans-Afghan Railway project, strongly pushed by Uzbekistan, which could now undergo a radical change to connect Tashkent with major potential export markets, including China and the EU.

Uzbekistan had already built a 75-kilometer rail link connecting Hairatan on the Uzbekistan-Afghanistan border to the city of Mazar-e-Sharif in northern Afghanistan back in 2011. However, due to high charges and operational issues, the section from Hairatan to Mazar-e-Sharif remains underutilized. Instead, most rail freight from Uzbekistan to Afghanistan is currently transferred to road transport near the border at Termez or Hairatan.

The Trans-Afghan railway project, first proposed in December 2018 by Uzbekistan, aims at extending the Afghan rail network from Mazar-e-Sharif to Kabul and then to Nangarhar province, where the railway would cross the Torkham border and run into Pakistan via Peshawar. Once in Pakistan, goods will be offloaded to connect with the Pakistan rail system and from there will eventually travel down to the Pakistani seaports of Karachi, Gwadar, and Qasim.

The railway would have a planned capacity of up to 20 million tons of cargo per annum, and once operational it would slice the travel time for goods transiting from Uzbekistan to Pakistan from 35 days to just 3 to 5 days. The railway line is planned to be 573 km and will be built with a 1,520 mm Russian gauge at an estimated cost of $4.8 billion. The time frame for the construction is approximately five years.

In February 2021 the plan for construction of the line was drawn up between Uzbekistan, Pakistan, and Afghanistan. The Uzbek Ministry of Investment and Foreign Affairs reported that with this route in place, by 2025 the volume of trade of India and Pakistan with Afghanistan and the CIS countries could reach $20 billion and $6 billion, respectively.

On July 19 it was announced that feasibility studies in Afghanistan along the proposed rail link have begun. At the same time, Kazakh President Kassym-Jomart Tokayev announced that Kazakhstan is ready to assist with the construction of the railway project with the supply of rolling stock and tracks.

Russia also has a role to play in this proposed railway project. For example, in October 2021, the first deputy general director of Russian Railways, Sergey Pavlov, met with Khusnutdin Khosilov, the chairman of Uzbekistan’s national railway company, O‘zbekiston Temir Yo‘llari. It was agreed that Russian Railways will help Uzbekistan conduct the feasibility study and develop a digital model of the railway line using the Russian broad gauge.

Challenges

The proposed rail line has the potential to shift Uzbekistan’s old status of “landlocked” to “land-linked.” This is needed for Uzbekistan’s economic security and to support trade with more distant nontraditional markets including in South Asia, Southeast Asia, and North America. However, financial, technical, and geographical obstacles remain, the biggest being the question of who will finance the proposed railway line. Also, given Afghanistan’s complicated environmental terrain, the projected cost could rise substantially.

The first major problem in the implementation of the project is the search for financing (about $4.8 billion). Tashkent planned to attract funds from the U.S. International Development Finance Corporation and other financial institutions (the World Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, etc.). However, no concrete commitments have been made so far. The recent feasibility studies are allegedly being financed by Uzbekistan, and Pakistan announced that it would help raise funds for the construction of the line. Additionally, Afghanistan is in no position to provide any financing as its assets remain frozen.

At the same time, the worsening security situation in Afghanistan has made it even more difficult to secure a credit line with financial institutions. The Taliban have been struggling to gain legitimacy in Afghanistan and are mired in ethnic clashes across the country. And while the Taliban-controlled government has offered security guarantees for the railway line, the Islamic State Khorasan Province (ISKP), which has been fighting the Taliban since around 2015, vowed to target anyone working on the Trans-Afghan railway line. As Raffaello Pantucci illustrated, “in Afghanistan, while the Taliban has repeatedly stated that it will not let its territory be used to plot terrorism against others, it has done little to stop it.” Administering the railway line is another question in itself, and if history serves as a preview, it would certainly not be a straightforward task.

Another barrier involves topographical and seasonal constraints. In Afghanistan, developers must contend with rugged, mountainous terrain, deep valleys, and a relatively dry climate with limited rainfall. These physical constraints are compounded by the harsh environmental conditions that manufacturers would have to navigate and adapt to during construction.

For instance, a part of the railway line is planned to run through the Salang Pass in the mountainous region of the Hindu Kush at an altitude of 3,500 meters. This would make it one of the highest railway lines in the world. The Salang Pass is prone to heavy snowfall and/or avalanches during the winter season, which could disable the railway for extended periods. To construct a railway line through this, manufacturers would need to build another tunnel under the mountain. This would add to the costs and could complicate, postpone, or prevent transport activities and investment. Issues of topography and weather conditions can place constraints on supporting infrastructure, and increase time and distance to markets.

However, in January the Afghan side approved the rail route through Baghlan and Bamiyan, seemingly an attempt to avoid the Salang Pass and its complications. This alternative Baghlan-Bamiyan route across the mountains is often used when the Salang Pass is temporarily closed for repairs. It may add to the journey time, but it can be a game changer for the rail route.

Other operational issues, such as indemnity payments to private landholders along the proposed railway line, ensuring the reliability of transmission routes in Afghanistan, and the need to train a local workforce both for the creation and maintenance of this railway line will have associated costs.

Another barrier to this project is the gauge issue. The railway line in Afghanistan will be built with the Russian broad 1,520 mm gauge so it can easily connect with railways from Uzbekistan which also uses this broad gauge. However, a change of gauge is required from 1,520 mm to 1,676 mm rail track at the Afghanistan-Pakistan border. Thus the trains must stop for several hours at the border while railway technicians change their wheel tracks. This adds to the delay and cost of the process.

Conclusion

By virtue of its geography, Uzbekistan is doubly landlocked. Since seaports are the gateways to the outside, Uzbekistan requires specific connections to coastal areas to allow it to trade with countries outside Central Asia. Without such links, the economic potential of the country is seen as very limited due to the loss of competitiveness arising from being landlocked. Thus, the creation of freight corridors connecting Uzbekistan with ports should be a priority. Pakistani seaports have been given priority because Uzbekistan sees Pakistan as a more stable partner than its alternatives, Iran and Turkmenistan. Once the present economic sanctions on Iran come to an end, there could be prospects for Uzbekistan to expand its use of the Bandar Abbas seaport and potentially Chabahar. On the route via Turkmenistan, cargo is subject to additional border inspections and transit tariffs, which adds to delays and costs.

Thus, a connected Uzbekistan has the potential to bring many opportunities that were not available before. While connectivity is not a panacea and indeed carries risks, it also carries the potential for Uzbekistan to improve its economy and become a master of its own future.

Tags: Gwadar portKarachi SeaportQasim PortRussia Ukraine warTrans-Afghan railway project

Kalpana Pandey

The Maritime Gateway Editorial Team delivers trusted news, analysis, and insights on shipping, ports, logistics, supply chains, and global trade, backed by industry expertise and editorial review.

Related Posts

India ship entry rules add salvage and pollution-response checks
Customs

India ship entry rules add salvage and pollution-response checks

October 10, 2026
NCT concession keeps ownership with Bangladesh
Asia

NCT concession keeps ownership with Bangladesh, says shipping minister

October 10, 2026
Major Ports Cargo Traffic Climbs 8% in First Half of FY27
Cargo

Major Ports Cargo Traffic Climbs 8% in First Half of FY27 as Growth Gathers Pace

October 10, 2026
Trichy Dry Port Moves Ahead
Cargo

Trichy Dry Port Moves Ahead as Tamil Nadu Shortlists Sites for Multimodal Logistics Hub

October 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Popular News

No Content Available
[mc4wp_form]
Next Post
Russia tightens oil supply to Europe

Rosneft starts constructing its largest oil terminal

A modern news portal designed for daily coverage of breaking stories, global events, politics, business, technology, sports, and entertainment. Built to deliver fast, reliable, and engaging journalism across every major news category.
[mc4wp_form]
Browse by Category
  • 2008
  • 2009
  • 2010
  • 2012
  • 2013
  • 2014
  • 2015
  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • 2022
  • 2023
  • 2024
  • 2025
  • 2026
  • Africa
  • Air Cargo
  • Americas
  • Articles
  • Asia
  • Bulk Ports
  • Bunkering
  • Business
  • Cargo
  • Container Terminals
  • Containers
  • Customs
  • Digital Dialogues
  • Dry Bulk
  • Economy
  • Entertainment
  • Equipment
  • Europe
  • EXIM
  • Featured
  • Forwarding
  • Global News
  • Government
  • Interviews
  • Lifestyle
  • Liquid Bulk
  • LNG
  • Logistics
  • Logistics Parks
  • Magazines
  • Main Line Operators
  • Middle East
  • Multimodal
  • National
  • News
  • Newsletters
  • NVOCC
  • Policy
  • Politics
  • Ports
  • Project Cargo
  • Rail
  • Recommended
  • Reports
  • Science
  • Shipping
  • Sports
  • Supply Chain
  • Tankers
  • Tech
  • Technology
  • Transport
  • Trending
  • Trucking
  • Uncategorized
  • Warehousing
  • Waterways
  • Webinars
  • World

Site Links

  • Site Admin
  • Log Out
  • Entries Feed
  • Comment Feed

Download Our App

Follow Us

© 2026 JNews – Premium WordPress news & magazine theme by Jegtheme.
  • Terms of Use
  • Privacy Policy
  • Manage Cookies
  • License

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Politics
  • World
  • Business
  • Science
  • National
  • Entertainment
  • Lifestyle
  • Tech

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.